601-tonne deck piece of WHPA West Block completed in base of China's Tianjin

**This is a 60-seconds sample of the video. For the full version, please contact us.**

601-tonne deck piece of WHPA West Block completed in base of China's Tianjin

STORY: 601-tonne deck piece of WHPA West Block completed in base of China's Tianjin DATELINE: June 15, 2022 LENGTH: 00:00:48 LOCATION: TIANJIN, China CATEGORY: TECHNOLOGY SHOTLIST: 1. various of the Tianjin Intelligent Manufacturing Base of China Offshore Oil Engineering Corporation STORYLINE: A 601-tonne deck piece of the WHPA West Block of the Bozhong 29-6 oilfield development project was successfully completed on Wednesday in the Tianjin Intelligent Manufacturing Base of China Offshore Oil Engineering Corporation (COOEC) in north China's Tianjin, marking the country's first offshore oil and gas equipment "intelligent manufacturing" project achieved the capping of the main structure of the first block construction unit.    The Bozhong 29-6 oilfield development project aims to increase the production of oil and gas in the Bohai Oilfield. The project relies on the digital information management and control system to complete the information connection of each production sector, so as to realize "productio

  • Product Code
  • ILEA000977954
  • Registered date
  • 2022/6/15 00:00:00
  • Credit
  • Xinhua / Kyodo News Images
  • Media source
  • Xinhua News Agency.All Rights Reserved
  • Media size
  • 1920 × 1080 pixel
  • Deployment size
  • 49.47(MB)*
  • Special instruction

*File size when opened in Photoshop, etc.

Similar Images & Videos