ROAD TOLL SYSTEM, KAPSCH

ROAD TOLL SYSTEM, KAPSCH

***FILE PHOTO*** A lorry passes under a toll bridge installed at 207th kilometer of the D1 motorway from Brno to Vyskov. By the 15th of November, the Kapsch company erected 135 toll points from the total of 171, finishing over 150 concrete foundations. The last toll bridge was to be erected on the 26th of November. Thanks to the warm weather of this autumn and winter, Kapsch managed to keep up with their own construction plan. (CTK Photo/Igor Sefr)

  • Product Code
  • ILEA000242575
  • Registered date
  • 2006/11/16 00:00:00
  • Credit
  • CTK / Kyodo News Images
  • Media source
  • CTK
  • Media size
  • 2875 × 1983 pixel
  • Resolution
  • 300 dpi
  • Deployment size
  • 1.15(MB)*
  • Special instruction
  • SLOVAKIA OUT, CZECH REPUBLIC OUT
    **The text may be generated by an automatic translation system**

*File size when opened in Photoshop, etc.

Similar Images & Videos