Robot checks Fukushima plant
TOKYO, Japan - A remotely operated robot opens double doors in the building housing the No. 3 reactor at the crippled Fukushima Daiichi Nuclear Power Station in Fukushima Prefecture on April 17, 2011. Tokyo Electric Power Co. began employing the robots to examine the temperature, radiation level and oxygen concentration inside the reactor building. (Photo courtesy of Tokyo Electric Power Co.)(Kyodo)
- Product Code
- ILEA000346346
- Registered date
- 2011/4/17 00:00:00
- Credit
- Kyodo / Kyodo News Images
- Media size
- 1806 × 1019 pixel
- Deployment size
- 1.07(MB)*
*File size when opened in Photoshop, etc.