Robot checks Fukushima plant

Robot checks Fukushima plant

TOKYO, Japan - A remotely operated robot opens double doors in the building housing the No. 3 reactor at the crippled Fukushima Daiichi Nuclear Power Station in Fukushima Prefecture on April 17, 2011. Tokyo Electric Power Co. began employing the robots to examine the temperature, radiation level and oxygen concentration inside the reactor building. (Photo courtesy of Tokyo Electric Power Co.)(Kyodo)

  • Product Code
  • ILEA000346346
  • Registered date
  • 2011/4/17 00:00:00
  • Credit
  • Kyodo / Kyodo News Images
  • Media source
  • Media size
  • 1806 × 1019 pixel
  • Resolution
  • 240 dpi
  • Deployment size
  • 1.07(MB)*
  • Special instruction

*File size when opened in Photoshop, etc.

Similar Images & Videos