Robot monitors Fukushima plant
TOKYO, Japan - A remotely operated robot goes through double doors in the building housing the No. 2 reactor at the crippled Fukushima Daiichi Nuclear Power Station in Fukushima Prefecture on April 18, 2011. Tokyo Electric Power Co. began employing the robots the previous day to monitor the temperature, radiation level and oxygen concentration inside the reactor buildings of the plant. (Photo courtesy of Tokyo Electric Power Co.)(Kyodo)
- Product Code
- ILEA000346441
- Registered date
- 2011/4/18 00:00:00
- Credit
- Kyodo / Kyodo News Images
- Media size
- 1674 × 1303 pixel
- Deployment size
- 1.15(MB)*
*File size when opened in Photoshop, etc.