BANGLADESH-NARSINGDI-CHINESE COMPANY-FERTILIZER EQUIPMENT-INSTALLATION
(220308) -- NARSINGDI (BANGLADESH), March 8, 2022 (Xinhua) -- A carbon dioxide stripper tower is installed at a fertilizer plant under construction in Narsingdi, Bangladesh, on March 8, 2022. The carbon dioxide stripping tower, the first super-heavy equipment of Bangladesh's Ghorashal-Polash Urea fertilizer project (GPUFP), the country's largest and first ever green fertilizer factory, was installed successfully on Tuesday. Engineers and workers from China National Chemical Engineering & Construction Corporation Seven Ltd successfully lifted and installed the tower, which is 68.5 meters high and has a self-weight of 447.5 tons. (Xinhua)
- Product Code
- ILEA000937850
- Registered date
- 2022/3/08 00:00:00
- Credit
- Xinhua / Kyodo News Images
- Media source
- Xinhua News Agency.All Rights Reserved
- Media size
- 4928 × 3280 pixel
- Deployment size
- 3.11(MB)*
*File size when opened in Photoshop, etc.