RWANDA-KIGALI-RUSUMO BORDER-HYDROELECTRIC PROJECT
(220822) -- KIGALI, Aug. 22, 2022 (Xinhua) -- Water flows through the open spillway gates upstream the waterfalls at the Rusumo border between Rwanda and Tanzania for the regional Rusumo Falls Hydroelectric Project on Aug. 20, 2022. Construction of the regional Rusumo Falls Hydroelectric Project has reached an implementation status of 95 percent before operational, Nile Equatorial Lakes Subsidiary Action Program Coordination Unit (NELSAP-CU) said in a statement on Saturday. (Photo by Cyril Ndegeya/Xinhua)
- Product Code
- ILEA001007852
- Registered date
- 2022/8/22 00:00:00
- Credit
- Xinhua / Kyodo News Images
- Media source
- Xinhua News Agency.All Rights Reserved
- Media size
- 3348 × 2265 pixel
- Deployment size
- 4.71(MB)*
*File size when opened in Photoshop, etc.