NE China's 400-MWh power storage utility put into operation

**This is a 60-seconds sample of the video. For the full version, please contact us.**

NE China's 400-MWh power storage utility put into operation

STORY: NE China's 400-MWh power storage utility put into operation DATELINE: Oct. 31, 2022 LENGTH: 00:00:52 LOCATION: DALIAN, China CATEGORY: TECHNOLOGY/SOCIETY SHOTLIST: 1. various of the Dalian Concurrent Energy Storage Power Station 2. various of the Dalian Institute of Chemical Physics (DICP) 3. SOUNDBITE (Chinese): LI XIANFENG, Deputy director of the DICP 4. various of wind and photovoltaic power generating units STORYLINE: The first phase of a power storage utility with a capacity of 400 MWh was put into operation in northeast China's Dalian on Sunday. According to the Dalian Institute of Chemical Physics (DICP) under the Chinese Academy of Sciences (CAS), the capacity of the Dalian Concurrent Energy Storage Power Station was designed to meet the electricity demand of some 200,000 residents per day and will be doubled to 800 MWh in the future. SOUNDBITE (Chinese): LI XIANFENG, Deputy director of the DICP "The energy storage technology, in our understanding, is to build a 'bank' for electricity, whe

  • Product Code
  • ILEA001032011
  • Registered date
  • 2022/11/01 00:00:00
  • Credit
  • Xinhua / Kyodo News Images
  • Media source
  • Xinhua News Agency.All Rights Reserved
  • Media size
  • 1920 × 1080 pixel
  • Deployment size
  • 52.30(MB)*
  • Special instruction

*File size when opened in Photoshop, etc.

Similar Images & Videos