Ship loading operation of large towers for ExxonMobil Huizhou project completed

**This is a 60-seconds sample of the video. For the full version, please contact us.**

Ship loading operation of large towers for ExxonMobil Huizhou project completed

STORY: Ship loading operation of large towers for ExxonMobil Huizhou project completed DATELINE: Nov. 3, 2022 LENGTH: 00:00:51 LOCATION: TIANJIN, China CATEGORY: TECHNOLOGY SHOTLIST: 1. various of the ship loading operation STORYLINE: The ship loading operation of two large towers for ExxonMobil's complex in Huizhou, southern China's Guangdong Province, was recently completed in north China's Tianjin. Multinational oil and gas corporation ExxonMobil broke ground on its solely-funded chemical complex in Huizhou in April 2020. The complex, with a total investment of about 10 billion U.S. dollars, will be built in two phases. The first phase with a 1.6 million tonne-per-year ethylene cracker and down-stream production equipment is scheduled to be completed by 2023 when construction on the second phase will begin. An annual operating income of 39 billion yuan (5.5 billion U.S. dollars) and 7.3 billion yuan of taxes will be expected when the first phase reaches designed capacity. The two large towers shipp

  • Product Code
  • ILEA001051740
  • Registered date
  • 2022/11/03 00:00:00
  • Credit
  • Xinhua / Kyodo News Images
  • Media source
  • Xinhua News Agency.All Rights Reserved
  • Media size
  • 1920 × 1080 pixel
  • Deployment size
  • 55.04(MB)*
  • Special instruction

*File size when opened in Photoshop, etc.

Similar Images & Videos