Russian gas pipeline "Power of Siberia" fully completed

**This is a 60-seconds sample of the video. For the full version, please contact us.**

Russian gas pipeline "Power of Siberia" fully completed

STORY: Russian gas pipeline "Power of Siberia" fully completed DATELINE: Dec. 23, 2022 LENGTH: 0:04:25 LOCATION: Moscow CATEGORY: ECONOMY SHOTLIST: 1. various of Kovykta gas field 2. video link footage of the commissioning ceremony 3. various of Kovykta gas field STORYLINE: A new gas field and a new pipeline section were connected on Wednesday to Russia's Power of Siberia pipeline, indicating full completion of the major gas route. The 800-km-long new section will transit gas from the Kovykta gas condensate field in the Irkutsk region to the Chayanda field in the Republic of Sakha before joining the preexisting part of the Power of Siberia pipeline. "This (new) section will complement the Power of Siberia main gas pipeline, thereby bringing our most important gas transportation route into operation throughout its entire length. It will exceed 3,000 km," Russian President Vladimir Putin said via video link at the commissioning ceremony for the Kovykta field and the Kovykta-Chayanda section of the Po

  • Product Code
  • ILEA001220414
  • Registered date
  • 2022/12/23 00:00:00
  • Credit
  • Xinhua / Kyodo News Images
  • Media source
  • Xinhua News Agency.All Rights Reserved
  • Media size
  • 1920 × 1080 pixel
  • Deployment size
  • 266.26(MB)*
  • Special instruction

*File size when opened in Photoshop, etc.

Similar Images & Videos