China Largest Jack-up Offshore Wind Installation Platform Delivery
The 1,200-ton jack-up offshore wind power installation platform "Huaxia Jinrent Shenda 01" built by Chinese ship Wuhan Shipbuilding Machinery is delivered in Qingdao West Coast New Area on July 25, 2023 in Qingdao, Shandong province, China. The platform is 106.6 meters long, 44.2 meters wide, 8.45 meters deep, and 110 meters long, which can meet the requirements of China's largest offshore wind turbine storage and installation. It is currently China's cylindrical pile leg installation platform with the longest pile leg, the largest operating water depth, the highest main crane lifting height, the most complete function and the highest efficiency.
- Product Code
- ILEA001556418
- Registered date
- 2023/7/25 00:00:00
- Credit
- CFOTO / Kyodo News Images
- Media size
- 4576 × 3480 pixel
- Deployment size
- 2.13(MB)*
- Special instruction
-
China Out
**The text may be generated by an automatic translation system**
*File size when opened in Photoshop, etc.