FPSO Completed in Qingdao

FPSO Completed in Qingdao

QINGDAO, CHINA - APRIL 26, 2024 - The Haikui No. 1 Floating Production, storage and offloading Unit (FPSO) is completed at Offshore Oil Engineering (Qingdao) Co., LTD., in Qingdao, Shandong province, China, April 26, 2024. Known as the "Super Energy Bowl", the "Anemone 1" has a maximum displacement of 100,000 tons, a maximum oil storage capacity of 60,000 tons, and can continuously operate at sea for 15 years without docking. According to reports, "Haikui No. 1" is the first cylindrical FPSO applied to Asian waters, and will be used in the Liuhua oilfield in the Pearl River Estuary basin.

  • Product Code
  • ILEA002614425
  • Registered date
  • 2024/4/26 00:00:00
  • Credit
  • CFOTO / Kyodo News Images
  • Media source
  • CFOTO
  • Media size
  • 2984 × 2140 pixel
  • Resolution
  • 72 dpi
  • Deployment size
  • 2.49(MB)*
  • Special instruction
  • No Use China
    **The text may be generated by an automatic translation system**

*File size when opened in Photoshop, etc.

Similar Images & Videos