Asia's first cylindrical FPSO facility arrives at working area

**This is a 60-seconds sample of the video. For the full version, please contact us.**

Asia's first cylindrical FPSO facility arrives at working area

STORY: Asia's first cylindrical FPSO facility arrives at working area SHOOTING TIME: May 12-29, 2024 DATELINE: May 31, 2024 LENGTH: 00:00:18 LOCATION: TIANJIN, China CATEGORY: MARKET SHOTLIST: 1. various of Haikui No. 1 STORYLINE: Asia's first cylindrical floating, production, storage, and offloading (FPSO) facility has arrived at its working area in China's Pearl River Estuary Basin. Haikui No. 1 is Asia's first cylindrical floating, production, storage, and offloading (FPSO) facility. It has arrived at its working area in the Pearl River estuary basin. Designed and built by China, Haikui No. 1 was completed and delivered in Qingdao last month. With a maximum displacement of 100,000 tons and storage capacity of 60,000 tons of oil, the facility is capable of operating for 15 years at sea without returning to dock. Xinhua News Agency correspondents reporting from Tianjin, China. (XHTV)

  • Product Code
  • ILEA002801708
  • Registered date
  • 2024/5/31 00:00:00
  • Credit
  • Xinhua / Kyodo News Images
  • Media source
  • Xinhua News Agency.All Rights Reserved
  • Media size
  • 608 × 1080 pixel
  • Deployment size
  • 17.13(MB)*
  • Special instruction

*File size when opened in Photoshop, etc.

Similar Images & Videos