AmazingAnhui | First-person view: Electrical workers inspect power transmission line over Yangtze River
(240603) -- WUHU, June 3, 2024 Photo by Xinhua/ABACAPRESS.COM) -- An aerial drone photo taken on April 10, 2024 shows electrical workers inspecting a power transmission line in Jiujiang District of Wuhu City, east China's Anhui Province. Electrical workers staged a "high-wire walk" above the Yangtze River to inspect a power transmission line in Wuhu. Stretching 2,080 kilometers, the 800 kV ultra-high voltage direct current transmission line between southwest China's Sichuan Province and east China's Jiangsu Province spans the Yangtze River here in Anhui. As a critical part of China's west-to-east power transmission project, this line annually transmits over 30 billion kWh of clean power. Electrical workers of Anhui Electric Power Transmission & Transformation Co., Ltd. inspected the line section across the Yangtze River to secure its operation. In nearly three hours, these workers climbed up and moved along the cables for more than 2 kilometers at a maximum height of 278.2 meters. (Photo by Zheng Xianlie/Xinh
- Product Code
- ILEA002814313
- Registered date
- 2024/4/10 00:00:00
- Credit
- Abaca Press / Kyodo News Images
- Media source
- Xinhua/ABACA
- Media size
- 3731 × 2242 pixel
- Deployment size
- 2.69(MB)*
*File size when opened in Photoshop, etc.