First Offshore Wind Power Installation Platform Delivered
QINGDAO, CHINA - AUGUST 28, 2024 - China's first self-elevating self-propelled offshore wind power installation platform equipped with a smart ship system is delivered in Qingdao, Shandong Province, China, on August 28, 2024. It is understood that the platform is 135 meters long, 50 meters wide, the maximum operating water depth of 70 meters, the maximum lifting capacity of 1,800 tons, and it is expected that more than 100 offshore fans can be installed in a year after the official operation.
- Product Code
- ILEA003207052
- Registered date
- 2024/8/28 00:00:00
- Credit
- CFOTO / Kyodo News Images
- Media size
- 3456 × 2268 pixel
- Deployment size
- 2.45(MB)*
- Special instruction
-
No Use China
**The text may be generated by an automatic translation system**
*File size when opened in Photoshop, etc.