•  
Urban Forest Installed at Paris City Hall - Paris

Urban Forest Installed at Paris City Hall - Paris

Urban forest on the forecourt of Paris City Hall. Generate shade and coolness. Paris, France on June 28, 2025. The square in front of City Hall has been transformed into a urban forest! Over 2,500 m² of green space and nearly 150 trees, some already 10 meters tall, now offer shade, freshness, and a new place to enjoy in the heart of Paris. Paris, France on June 28, 2025. Photo by Mario Fourmy/ABACAPRESS.COM

  •  
Urban Forest Installed at Paris City Hall - Paris

Urban Forest Installed at Paris City Hall - Paris

Urban forest on the forecourt of Paris City Hall. Generate shade and coolness. Paris, France on June 28, 2025. The square in front of City Hall has been transformed into a urban forest! Over 2,500 m² of green space and nearly 150 trees, some already 10 meters tall, now offer shade, freshness, and a new place to enjoy in the heart of Paris. Paris, France on June 28, 2025. Photo by Mario Fourmy/ABACAPRESS.COM

  •  
Urban Forest Installed at Paris City Hall - Paris

Urban Forest Installed at Paris City Hall - Paris

Urban forest on the forecourt of Paris City Hall. Generate shade and coolness. Paris, France on June 28, 2025. The square in front of City Hall has been transformed into a urban forest! Over 2,500 m² of green space and nearly 150 trees, some already 10 meters tall, now offer shade, freshness, and a new place to enjoy in the heart of Paris. Paris, France on June 28, 2025. Photo by Mario Fourmy/ABACAPRESS.COM

  •  
Urban Forest Installed at Paris City Hall - Paris

Urban Forest Installed at Paris City Hall - Paris

Urban forest on the forecourt of Paris City Hall. Generate shade and coolness. Paris, France on June 28, 2025. The square in front of City Hall has been transformed into a urban forest! Over 2,500 m² of green space and nearly 150 trees, some already 10 meters tall, now offer shade, freshness, and a new place to enjoy in the heart of Paris. Paris, France on June 28, 2025. Photo by Mario Fourmy/ABACAPRESS.COM

  •  
Sanchez Presides Over Inauguration of University Hospital in Melilla

Sanchez Presides Over Inauguration of University Hospital in Melilla

The President of the Government, Pedro Sánchez (2D), the President of Melilla, Juan José Imbroda (R), the Minister of Health, Mónica García (2L), and the Government Delegate in the autonomous city, Sabrina Moh (L), during the inauguration ceremony of the Melilla University Hospital (HUME), on June 2, 2025, in Melilla (Spain). The hospital, which has involved a final investment of 150 million euros and whose work has been co-financed by Spain's ERDF 2021-2027 Multiregional Program, will house more than 1,100 professionals and will have 40 services with advanced technology. The infrastructure has 45,000 square meters of healthcare surface area out of the 63,000 square meters built. Photo by Oscar Giménez Barrios/Europa Press/ABACAPRESS.COM

  •  
Sanchez Presides Over Inauguration of University Hospital in Melilla

Sanchez Presides Over Inauguration of University Hospital in Melilla

The President of the Government, Pedro Sánchez (R), and the government delegate in the autonomous city, Sabrina Moh (2D), during the inauguration ceremony of the Melilla University Hospital (HUME), on June 2, 2025, in Melilla (Spain). The hospital, which has involved a final investment of 150 million euros and whose work has been co-financed by Spain's ERDF 2021-2027 Multiregional Program, will house more than 1,100 professionals and will have 40 services with advanced technology. The infrastructure has 45,000 square meters of healthcare surface area out of the 63,000 square meters built. Photo by Oscar Giménez Barrios/Europa Press/ABACAPRESS.COM

  •  
Sanchez Presides Over Inauguration of University Hospital in Melilla

Sanchez Presides Over Inauguration of University Hospital in Melilla

The President of the Government, Pedro Sánchez, during the inauguration ceremony of the Melilla University Hospital (HUME), on June 2, 2025, in Melilla (Spain). The hospital, which has involved a final investment of 150 million euros and whose work has been co-financed by Spain's ERDF Multiregional Program 2021-2027, will house more than 1,100 professionals and will have 40 services with advanced technology. The infrastructure has 45,000 square meters of healthcare surface area out of the 63,000 square meters built. Photo by Oscar Giménez Barrios/Europa Press/ABACAPRESS.COM

  •  
Sanchez Presides Over Inauguration of University Hospital in Melilla

Sanchez Presides Over Inauguration of University Hospital in Melilla

The President of the Government, Pedro Sánchez (2D), the President of Melilla, Juan José Imbroda (R), the Minister of Health, Mónica García (2L), and the Government Delegate in the autonomous city, Sabrina Moh (L), during the inauguration ceremony of the Melilla University Hospital (HUME), on June 2, 2025, in Melilla (Spain). The hospital, which has involved a final investment of 150 million euros and whose work has been co-financed by Spain's ERDF 2021-2027 Multiregional Program, will house more than 1,100 professionals and will have 40 services with advanced technology. The infrastructure has 45,000 square meters of healthcare surface area out of the 63,000 square meters built. Photo by Oscar Giménez Barrios/Europa Press/ABACAPRESS.COM

  •  
Sanchez Presides Over Inauguration of University Hospital in Melilla

Sanchez Presides Over Inauguration of University Hospital in Melilla

The President of the Government, Pedro Sánchez, during the inauguration ceremony of the Melilla University Hospital (HUME), on June 2, 2025, in Melilla (Spain). The hospital, which has involved a final investment of 150 million euros and whose work has been co-financed by Spain's ERDF Multiregional Program 2021-2027, will house more than 1,100 professionals and will have 40 services with advanced technology. The infrastructure has 45,000 square meters of healthcare surface area out of the 63,000 square meters built. Photo by Oscar Giménez Barrios/Europa Press/ABACAPRESS.COM

  •  
Sanchez Presides Over Inauguration of University Hospital in Melilla

Sanchez Presides Over Inauguration of University Hospital in Melilla

The President of the Government, Pedro Sánchez (R), the Minister of Health, Mónica García (2D), and the government delegate in the autonomous city, Sabrina Moh (3D) during the inauguration ceremony of the Melilla University Hospital (HUME), on June 2, 2025, in Melilla (Spain). The hospital, which has involved a final investment of 150 million euros and whose work has been co-financed by Spain's ERDF 2021-2027 Multiregional Program, will house more than 1,100 professionals and will have 40 services with advanced technology. The infrastructure has 45,000 square meters of healthcare surface area out of the 63,000 square meters built. Photo by Oscar Giménez Barrios/Europa Press/ABACAPRESS.COM

  •  
Sanchez Presides Over Inauguration of University Hospital in Melilla

Sanchez Presides Over Inauguration of University Hospital in Melilla

The President of the Government, Pedro Sánchez (R), and the Minister of Health, Mónica García (2L), and the government delegate in the autonomous city, Sabrina Moh (L), during the inauguration ceremony of the Melilla University Hospital (HUME), on June 2, 2025, in Melilla (Spain). The hospital, which has involved a final investment of 150 million euros and whose work has been co-financed by Spain's ERDF 2021-2027 Multiregional Program, will house more than 1,100 professionals and will have 40 services with advanced technology. The infrastructure has 45,000 square meters of healthcare surface area out of the 63,000 square meters built. Photo by Oscar Giménez Barrios/Europa Press/ABACAPRESS.COM

  •  
Sanchez Presides Over Inauguration of University Hospital in Melilla

Sanchez Presides Over Inauguration of University Hospital in Melilla

The President of the Government, Pedro Sánchez (C), and the Minister of Health, Mónica García (L), and the government delegate in the autonomous city, Sabrina Moh (2L) during the inauguration ceremony of the Melilla University Hospital (HUME), on June 2, 2025, in Melilla (Spain). The hospital, which has involved a final investment of 150 million euros and whose work has been co-financed by Spain's ERDF 2021-2027 Multiregional Program, will house more than 1,100 professionals and will have 40 services with advanced technology. The infrastructure has 45,000 square meters of healthcare surface area out of the 63,000 square meters built. Photo by Oscar Giménez Barrios/Europa Press/ABACAPRESS.COM

  •  
Sanchez Presides Over Inauguration of University Hospital in Melilla

Sanchez Presides Over Inauguration of University Hospital in Melilla

The President of the Government, Pedro Sánchez (C) the Minister of Health, Mónica García (L), and the Government Delegate in the autonomous city, Sabrina Moh (2L) during the inauguration ceremony of the Melilla University Hospital (HUME), on June 2, 2025, in Melilla (Spain). The hospital, which has involved a final investment of 150 million euros and whose work has been co-financed by Spain's ERDF 2021-2027 Multiregional Program, will house more than 1,100 professionals and will have 40 services with advanced technology. The infrastructure has 45,000 square meters of healthcare surface area out of the 63,000 square meters built. Photo by Oscar Giménez Barrios/Europa Press/ABACAPRESS.COM

  •  
A Smart Energy Comprehensive Demonstration Supercharger Station in Hangzhou

A Smart Energy Comprehensive Demonstration Supercharger Station in Hangzhou

An aerial photo shows a smart energy comprehensive demonstration supercharger station in Hangzhou, Zhejiang province, China on April 15, 2025. It is understood that the smart energy comprehensive demonstration supercharger station has 64 charging parking Spaces, of which 62 are fast charging guns with 120 kW power, and are equipped with a single gun with a maximum power of 600 kW and a V2G reverse charging pile that can realize the two-way energy flow between the car and the grid. At the same time, the station is also equipped with 150 square meters of warm post station, which can provide spacious, comfortable and clean rest environment for drivers 24 hours.

  •  
A Smart Energy Comprehensive Demonstration Supercharger Station in Hangzhou

A Smart Energy Comprehensive Demonstration Supercharger Station in Hangzhou

An aerial photo shows a smart energy comprehensive demonstration supercharger station in Hangzhou, Zhejiang province, China on April 15, 2025. It is understood that the smart energy comprehensive demonstration supercharger station has 64 charging parking Spaces, of which 62 are fast charging guns with 120 kW power, and are equipped with a single gun with a maximum power of 600 kW and a V2G reverse charging pile that can realize the two-way energy flow between the car and the grid. At the same time, the station is also equipped with 150 square meters of warm post station, which can provide spacious, comfortable and clean rest environment for drivers 24 hours.

  •  
A Smart Energy Comprehensive Demonstration Supercharger Station in Hangzhou

A Smart Energy Comprehensive Demonstration Supercharger Station in Hangzhou

An aerial photo shows a smart energy comprehensive demonstration supercharger station in Hangzhou, Zhejiang province, China on April 15, 2025. It is understood that the smart energy comprehensive demonstration supercharger station has 64 charging parking Spaces, of which 62 are fast charging guns with 120 kW power, and are equipped with a single gun with a maximum power of 600 kW and a V2G reverse charging pile that can realize the two-way energy flow between the car and the grid. At the same time, the station is also equipped with 150 square meters of warm post station, which can provide spacious, comfortable and clean rest environment for drivers 24 hours.

  •  
A Smart Energy Comprehensive Demonstration Supercharger Station in Hangzhou

A Smart Energy Comprehensive Demonstration Supercharger Station in Hangzhou

An aerial photo shows a smart energy comprehensive demonstration supercharger station in Hangzhou, Zhejiang province, China on April 15, 2025. It is understood that the smart energy comprehensive demonstration supercharger station has 64 charging parking Spaces, of which 62 are fast charging guns with 120 kW power, and are equipped with a single gun with a maximum power of 600 kW and a V2G reverse charging pile that can realize the two-way energy flow between the car and the grid. At the same time, the station is also equipped with 150 square meters of warm post station, which can provide spacious, comfortable and clean rest environment for drivers 24 hours.

  •  
A Smart Energy Comprehensive Demonstration Supercharger Station in Hangzhou

A Smart Energy Comprehensive Demonstration Supercharger Station in Hangzhou

An aerial photo shows a smart energy comprehensive demonstration supercharger station in Hangzhou, Zhejiang province, China on April 15, 2025. It is understood that the smart energy comprehensive demonstration supercharger station has 64 charging parking Spaces, of which 62 are fast charging guns with 120 kW power, and are equipped with a single gun with a maximum power of 600 kW and a V2G reverse charging pile that can realize the two-way energy flow between the car and the grid. At the same time, the station is also equipped with 150 square meters of warm post station, which can provide spacious, comfortable and clean rest environment for drivers 24 hours.

  •  
A Smart Energy Comprehensive Demonstration Supercharger Station in Hangzhou

A Smart Energy Comprehensive Demonstration Supercharger Station in Hangzhou

An aerial photo shows a smart energy comprehensive demonstration supercharger station in Hangzhou, Zhejiang province, China on April 15, 2025. It is understood that the smart energy comprehensive demonstration supercharger station has 64 charging parking Spaces, of which 62 are fast charging guns with 120 kW power, and are equipped with a single gun with a maximum power of 600 kW and a V2G reverse charging pile that can realize the two-way energy flow between the car and the grid. At the same time, the station is also equipped with 150 square meters of warm post station, which can provide spacious, comfortable and clean rest environment for drivers 24 hours.

  •  
A Smart Energy Comprehensive Demonstration Supercharger Station in Hangzhou

A Smart Energy Comprehensive Demonstration Supercharger Station in Hangzhou

An aerial photo shows a smart energy comprehensive demonstration supercharger station in Hangzhou, Zhejiang province, China on April 15, 2025. It is understood that the smart energy comprehensive demonstration supercharger station has 64 charging parking Spaces, of which 62 are fast charging guns with 120 kW power, and are equipped with a single gun with a maximum power of 600 kW and a V2G reverse charging pile that can realize the two-way energy flow between the car and the grid. At the same time, the station is also equipped with 150 square meters of warm post station, which can provide spacious, comfortable and clean rest environment for drivers 24 hours.

  •  
A Smart Energy Comprehensive Demonstration Supercharger Station in Hangzhou

A Smart Energy Comprehensive Demonstration Supercharger Station in Hangzhou

An aerial photo shows a smart energy comprehensive demonstration supercharger station in Hangzhou, Zhejiang province, China on April 15, 2025. It is understood that the smart energy comprehensive demonstration supercharger station has 64 charging parking Spaces, of which 62 are fast charging guns with 120 kW power, and are equipped with a single gun with a maximum power of 600 kW and a V2G reverse charging pile that can realize the two-way energy flow between the car and the grid. At the same time, the station is also equipped with 150 square meters of warm post station, which can provide spacious, comfortable and clean rest environment for drivers 24 hours.

  •  
A Smart Energy Comprehensive Demonstration Supercharger Station in Hangzhou

A Smart Energy Comprehensive Demonstration Supercharger Station in Hangzhou

An aerial photo shows a smart energy comprehensive demonstration supercharger station in Hangzhou, Zhejiang province, China on April 15, 2025. It is understood that the smart energy comprehensive demonstration supercharger station has 64 charging parking Spaces, of which 62 are fast charging guns with 120 kW power, and are equipped with a single gun with a maximum power of 600 kW and a V2G reverse charging pile that can realize the two-way energy flow between the car and the grid. At the same time, the station is also equipped with 150 square meters of warm post station, which can provide spacious, comfortable and clean rest environment for drivers 24 hours.

  •  
A Smart Energy Comprehensive Demonstration Supercharger Station in Hangzhou

A Smart Energy Comprehensive Demonstration Supercharger Station in Hangzhou

An aerial photo shows a smart energy comprehensive demonstration supercharger station in Hangzhou, Zhejiang province, China on April 15, 2025. It is understood that the smart energy comprehensive demonstration supercharger station has 64 charging parking Spaces, of which 62 are fast charging guns with 120 kW power, and are equipped with a single gun with a maximum power of 600 kW and a V2G reverse charging pile that can realize the two-way energy flow between the car and the grid. At the same time, the station is also equipped with 150 square meters of warm post station, which can provide spacious, comfortable and clean rest environment for drivers 24 hours.

  •  
A Smart Energy Comprehensive Demonstration Supercharger Station in Hangzhou

A Smart Energy Comprehensive Demonstration Supercharger Station in Hangzhou

An aerial photo shows a smart energy comprehensive demonstration supercharger station in Hangzhou, Zhejiang province, China on April 15, 2025. It is understood that the smart energy comprehensive demonstration supercharger station has 64 charging parking Spaces, of which 62 are fast charging guns with 120 kW power, and are equipped with a single gun with a maximum power of 600 kW and a V2G reverse charging pile that can realize the two-way energy flow between the car and the grid. At the same time, the station is also equipped with 150 square meters of warm post station, which can provide spacious, comfortable and clean rest environment for drivers 24 hours.

  •  
A Smart Energy Comprehensive Demonstration Supercharger Station in Hangzhou

A Smart Energy Comprehensive Demonstration Supercharger Station in Hangzhou

An aerial photo shows a smart energy comprehensive demonstration supercharger station in Hangzhou, Zhejiang province, China on April 15, 2025. It is understood that the smart energy comprehensive demonstration supercharger station has 64 charging parking Spaces, of which 62 are fast charging guns with 120 kW power, and are equipped with a single gun with a maximum power of 600 kW and a V2G reverse charging pile that can realize the two-way energy flow between the car and the grid. At the same time, the station is also equipped with 150 square meters of warm post station, which can provide spacious, comfortable and clean rest environment for drivers 24 hours.

  •  
A Smart Energy Comprehensive Demonstration Supercharger Station in Hangzhou

A Smart Energy Comprehensive Demonstration Supercharger Station in Hangzhou

An aerial photo shows a smart energy comprehensive demonstration supercharger station in Hangzhou, Zhejiang province, China on April 15, 2025. It is understood that the smart energy comprehensive demonstration supercharger station has 64 charging parking Spaces, of which 62 are fast charging guns with 120 kW power, and are equipped with a single gun with a maximum power of 600 kW and a V2G reverse charging pile that can realize the two-way energy flow between the car and the grid. At the same time, the station is also equipped with 150 square meters of warm post station, which can provide spacious, comfortable and clean rest environment for drivers 24 hours.

  •  
A Smart Energy Comprehensive Demonstration Supercharger Station in Hangzhou

A Smart Energy Comprehensive Demonstration Supercharger Station in Hangzhou

An aerial photo shows a smart energy comprehensive demonstration supercharger station in Hangzhou, Zhejiang province, China on April 15, 2025. It is understood that the smart energy comprehensive demonstration supercharger station has 64 charging parking Spaces, of which 62 are fast charging guns with 120 kW power, and are equipped with a single gun with a maximum power of 600 kW and a V2G reverse charging pile that can realize the two-way energy flow between the car and the grid. At the same time, the station is also equipped with 150 square meters of warm post station, which can provide spacious, comfortable and clean rest environment for drivers 24 hours.

  •  
A Smart Energy Comprehensive Demonstration Supercharger Station in Hangzhou

A Smart Energy Comprehensive Demonstration Supercharger Station in Hangzhou

An aerial photo shows a smart energy comprehensive demonstration supercharger station in Hangzhou, Zhejiang province, China on April 15, 2025. It is understood that the smart energy comprehensive demonstration supercharger station has 64 charging parking Spaces, of which 62 are fast charging guns with 120 kW power, and are equipped with a single gun with a maximum power of 600 kW and a V2G reverse charging pile that can realize the two-way energy flow between the car and the grid. At the same time, the station is also equipped with 150 square meters of warm post station, which can provide spacious, comfortable and clean rest environment for drivers 24 hours.

  •  
A Smart Energy Comprehensive Demonstration Supercharger Station in Hangzhou

A Smart Energy Comprehensive Demonstration Supercharger Station in Hangzhou

An aerial photo shows a smart energy comprehensive demonstration supercharger station in Hangzhou, Zhejiang province, China on April 15, 2025. It is understood that the smart energy comprehensive demonstration supercharger station has 64 charging parking Spaces, of which 62 are fast charging guns with 120 kW power, and are equipped with a single gun with a maximum power of 600 kW and a V2G reverse charging pile that can realize the two-way energy flow between the car and the grid. At the same time, the station is also equipped with 150 square meters of warm post station, which can provide spacious, comfortable and clean rest environment for drivers 24 hours.

  •  
A Smart Energy Comprehensive Demonstration Supercharger Station in Hangzhou

A Smart Energy Comprehensive Demonstration Supercharger Station in Hangzhou

An aerial photo shows a smart energy comprehensive demonstration supercharger station in Hangzhou, Zhejiang province, China on April 15, 2025. It is understood that the smart energy comprehensive demonstration supercharger station has 64 charging parking Spaces, of which 62 are fast charging guns with 120 kW power, and are equipped with a single gun with a maximum power of 600 kW and a V2G reverse charging pile that can realize the two-way energy flow between the car and the grid. At the same time, the station is also equipped with 150 square meters of warm post station, which can provide spacious, comfortable and clean rest environment for drivers 24 hours.

  •  
A Smart Energy Comprehensive Demonstration Supercharger Station in Hangzhou

A Smart Energy Comprehensive Demonstration Supercharger Station in Hangzhou

An aerial photo shows a smart energy comprehensive demonstration supercharger station in Hangzhou, Zhejiang province, China on April 15, 2025. It is understood that the smart energy comprehensive demonstration supercharger station has 64 charging parking Spaces, of which 62 are fast charging guns with 120 kW power, and are equipped with a single gun with a maximum power of 600 kW and a V2G reverse charging pile that can realize the two-way energy flow between the car and the grid. At the same time, the station is also equipped with 150 square meters of warm post station, which can provide spacious, comfortable and clean rest environment for drivers 24 hours.

  •  
Spain Disaster Death Toll Reaches 214 - Valencia

Spain Disaster Death Toll Reaches 214 - Valencia

Several people work in the debris removal of an area affected by the DANA, October 31, 2024, in Letur, Albacete, Castilla-La Mancha (Spain). The device of about 150 troops working in the search for the five missing people in the municipality of Letur after the flood caused by the DANA has resumed early today the tasks, which are mainly focused on combing the area of the natural bed of the stream that overflowed last October 29 and where the water rose to ten meters above its usual level. Yesterday, October 30, the lifeless body of a woman was found. Photo by Víctor Fernández/Europa Press/ABACAPRESS.COM

  •  
Spain Disaster Death Toll Reaches 214 - Valencia

Spain Disaster Death Toll Reaches 214 - Valencia

Several people work to clean the mud from an area affected by the DANA, October 31, 2024, in Letur, Albacete, Castilla-La Mancha (Spain). The device of about 150 troops working in the search for the five missing people in the municipality of Letur after the flood caused by the DANA has resumed early today the tasks, which are mainly focused on combing the area of the natural bed of the stream that overflowed last October 29 and where the water rose to ten meters above its usual level. Yesterday, October 30, the lifeless body of a woman was found. Photo by Víctor Fernández/Europa Press/ABACAPRESS.COM

  •  
Spain Disaster Death Toll Reaches 214 - Valencia

Spain Disaster Death Toll Reaches 214 - Valencia

Several people work in the debris removal of an area affected by the DANA, October 31, 2024, in Letur, Albacete, Castilla-La Mancha (Spain). The device of about 150 troops working in the search for the five missing people in the municipality of Letur after the flood caused by the DANA has resumed early today the tasks, which are mainly focused on combing the area of the natural bed of the stream that overflowed last October 29 and where the water rose to ten meters above its usual level. Yesterday, October 30, the lifeless body of a woman was found. Photo by Víctor Fernández/Europa Press/ABACAPRESS.COM

  •  
Spain Disaster Death Toll Reaches 214 - Valencia

Spain Disaster Death Toll Reaches 214 - Valencia

Interior of a house affected by the DANA, on October 31, 2024, in Letur, Albacete, Castilla-La Mancha (Spain). The device of about 150 troops working in the search for the five missing people in the municipality of Letur after the flood caused by the DANA has resumed early today tasks, which are mainly focused on combing the area of the natural channel of the stream that overflowed last October 29 and where the water rose to ten meters above its usual level. Yesterday, October 30, the lifeless body of a woman was found. Photo by Víctor Fernández/Europa Press/ABACAPRESS.COM

  •  
Spain Disaster Death Toll Reaches 214 - Valencia

Spain Disaster Death Toll Reaches 214 - Valencia

Several agents of the Guardia Civil work in the search for missing persons in an area affected by the DANA, October 31, 2024, in Letur, Albacete, Castilla-La Mancha (Spain). The device of about 150 troops working in the search for the five missing people in the municipality of Letur after the flood caused by the DANA has resumed early today tasks, which are mainly focused on combing the area of the natural bed of the stream that overflowed last October 29 and where the water rose up to ten meters above its usual level. Yesterday, October 30, the lifeless body of a woman was found. Photo by Víctor Fernández/Europa Press/ABACAPRESS.COM

  •  
Spain Disaster Death Toll Reaches 214 - Valencia

Spain Disaster Death Toll Reaches 214 - Valencia

A tractor works in an area affected by the DANA, on October 31, 2024, in Letur, Albacete, Castilla-La Mancha (Spain). The device of about 150 troops working in the search for the five people missing in the municipality of Letur after the flood caused by the DANA has resumed early today tasks, which are mainly focused on combing the area of the natural bed of the stream that overflowed last October 29 and where the water rose to ten meters above its usual level. Yesterday, October 30, the lifeless body of a woman was found. Photo by Víctor Fernández/Europa Press/ABACAPRESS.COM

  •  
Spain Disaster Death Toll Reaches 214 - Valencia

Spain Disaster Death Toll Reaches 214 - Valencia

A man works on clearing debris from an area affected by the DANA, October 31, 2024, in Letur, Albacete, Castilla-La Mancha (Spain). The device of about 150 troops working in the search for the five missing people in the municipality of Letur after the flood caused by the DANA has resumed early today the tasks, which are mainly focused on combing the area of the natural bed of the stream that overflowed last October 29 and where the water rose to ten meters above its usual level. Yesterday, October 30, the lifeless body of a woman was found. Photo by Víctor Fernández/Europa Press/ABACAPRESS.COM

  •  
XINHUA PHOTOS OF THE DAY

XINHUA PHOTOS OF THE DAY

(240712) -- BEIJING, July 12, 2024 Photo by Xinhua/ABACAPRESS.COM) -- This photo taken on July 10, 2024 shows part of an Apatosaurus' dinosaur skeleton at the Dampierre-en-Yvelines castle prior to an auction in Dampierre-en-Yvelines, south of Paris, France. Measuring 21 meters long, this skeleton from about 150 million years ago is scheduled for auction in November this year. (Photo by Aurelien Morissard/Xinhua/ABACAPRESS.COM

  •  
Dinosaur Skeleton On Display - Dampierre-en-Yvelines

Dinosaur Skeleton On Display - Dampierre-en-Yvelines

This photo taken on July 10, 2024 shows part of an Apatosaurus' dinosaur skeleton at the Dampierre-en-Yvelines castle prior to an auction in Dampierre-en-Yvelines, south of Paris, France. Measuring 21 meters long, this skeleton from about 150 million years ago is scheduled for auction in November this year. Photo by Aurelien Morissard/Xinhua/ABACAPRESS.COM

  •  
Dinosaur Skeleton On Display - Dampierre-en-Yvelines

Dinosaur Skeleton On Display - Dampierre-en-Yvelines

Workers assemble the skeleton of an Apatosaurus' dinosaur at the Dampierre-en-Yvelines castle in Dampierre-en-Yvelines, south of Paris, France, July 10, 2024. Measuring 21 meters long, this skeleton from about 150 million years ago is scheduled for auction in November this year. Photo by Aurelien Morissard/Xinhua/ABACAPRESS.COM

  •  
Dinosaur Skeleton On Display - Dampierre-en-Yvelines

Dinosaur Skeleton On Display - Dampierre-en-Yvelines

This photo taken on July 10, 2024 shows part of an Apatosaurus' dinosaur skeleton at the Dampierre-en-Yvelines castle prior to an auction in Dampierre-en-Yvelines, south of Paris, France. Measuring 21 meters long, this skeleton from about 150 million years ago is scheduled for auction in November this year. Photo by Aurelien Morissard/Xinhua/ABACAPRESS.COM

  •  
Dinosaur Skeleton On Display - Dampierre-en-Yvelines

Dinosaur Skeleton On Display - Dampierre-en-Yvelines

Workers assemble the skeleton of an Apatosaurus' dinosaur at the Dampierre-en-Yvelines castle in Dampierre-en-Yvelines, south of Paris, France, July 10, 2024. Measuring 21 meters long, this skeleton from about 150 million years ago is scheduled for auction in November this year. Photo by Aurelien Morissard/Xinhua/ABACAPRESS.COM

  •  
Dinosaur Skeleton On Display - Dampierre-en-Yvelines

Dinosaur Skeleton On Display - Dampierre-en-Yvelines

A worker assembles the skeleton of an Apatosaurus' dinosaur at the Dampierre-en-Yvelines castle in Dampierre-en-Yvelines, south of Paris, France, July 10, 2024. Measuring 21 meters long, this skeleton from about 150 million years ago is scheduled for auction in November this year. Photo by Aurelien Morissard/Xinhua/ABACAPRESS.COM

  •  
Dinosaur Skeleton On Display - Dampierre-en-Yvelines

Dinosaur Skeleton On Display - Dampierre-en-Yvelines

An Apatosaurus' dinosaur skeleton is displayed at the Dampierre-en-Yvelines castle in Dampierre-en-Yvelines, south of Paris, France, July 10, 2024. Measuring 21 meters long, this skeleton from about 150 million years ago is scheduled for auction in November this year. Photo by Aurelien Morissard/Xinhua/ABACAPRESS.COM

  •  
Dinosaur Skeleton On Display - Dampierre-en-Yvelines

Dinosaur Skeleton On Display - Dampierre-en-Yvelines

An Apatosaurus' dinosaur skeleton is displayed at the Dampierre-en-Yvelines castle in Dampierre-en-Yvelines, south of Paris, France, July 10, 2024. Measuring 21 meters long, this skeleton from about 150 million years ago is scheduled for auction in November this year. Photo by Aurelien Morissard/Xinhua/ABACAPRESS.COM

  •  
Dinosaur Skeleton On Display - Dampierre-en-Yvelines

Dinosaur Skeleton On Display - Dampierre-en-Yvelines

This photo taken on July 10, 2024 shows part of an Apatosaurus' dinosaur skeleton at the Dampierre-en-Yvelines castle prior to an auction in Dampierre-en-Yvelines, south of Paris, France. Measuring 21 meters long, this skeleton from about 150 million years ago is scheduled for auction in November this year. Photo by Aurelien Morissard/Xinhua/ABACAPRESS.COM

  •  
Dinosaur Skeleton On Display - Dampierre-en-Yvelines

Dinosaur Skeleton On Display - Dampierre-en-Yvelines

An Apatosaurus' dinosaur skeleton is displayed at the Dampierre-en-Yvelines castle in Dampierre-en-Yvelines, south of Paris, France, July 10, 2024. Measuring 21 meters long, this skeleton from about 150 million years ago is scheduled for auction in November this year. Photo by Aurelien Morissard/Xinhua/ABACAPRESS.COM

  •  
Dinosaur Skeleton On Display - Dampierre-en-Yvelines

Dinosaur Skeleton On Display - Dampierre-en-Yvelines

An Apatosaurus' dinosaur skeleton is displayed at the Dampierre-en-Yvelines castle in Dampierre-en-Yvelines, south of Paris, France, July 10, 2024. Measuring 21 meters long, this skeleton from about 150 million years ago is scheduled for auction in November this year. Photo by Aurelien Morissard/Xinhua/ABACAPRESS.COM

  •  
Dinosaur Skeleton On Display - Dampierre-en-Yvelines

Dinosaur Skeleton On Display - Dampierre-en-Yvelines

An Apatosaurus' dinosaur skeleton is displayed at the Dampierre-en-Yvelines castle in Dampierre-en-Yvelines, south of Paris, France, July 10, 2024. Measuring 21 meters long, this skeleton from about 150 million years ago is scheduled for auction in November this year. Photo by Aurelien Morissard/Xinhua/ABACAPRESS.COM

  • Main
  • Top
  • Editorial
  • Creative
  • About Us
  • About ILG
  • Terms of use
  • Company
  • BEHIND
  • Price List
  • Single Plan
  • Monthly Plan
  • Services
  • Shooting
  • Rights Clearance
  • Support
  • FAQ
  • How To Buy
  • Contact Us
  • Become a Partner

© KYODO NEWS IMAGES INC

All Rights Reserved.

  • Editorial
  • Olympics
  • News
  • Sports
  • Japan
  • Tech
  • Royal
  • Disaster
  • NorthKorea
  • Old Japan
  • SNS
  • Creative
  • Food
  • Japan
  • Landscape
  • Animal
  • Popular
  • #Ukraine
  • #Russia
  • #coronavirus
  • #N. Korea
  • #Thailand
  • #China
  • #Ukraine
  • #Russia
  • #coronavirus
  • #N. Korea
  • #Thailand
  • #China
  • Food
  • Japan
  • Landscape
  • Animal
  • Olympics
  • News
  • Sports
  • Japan
  • Tech
  • Royal
  • Disaster
  • NorthKorea
  • Old Japan
  • SNS