•  
Illustration of the Gare de Lyon during the Christmas holiday departures - Paris AJ

Illustration of the Gare de Lyon during the Christmas holiday departures - Paris AJ

This photo is an illustration showing Ouigo high-speed trains (TGV) on the station platform during the Minister of Transport's visit, coinciding with the start of the Christmas and New Year holidays, the purpose was to review the security measures deployed during peak travel periods. This visit is part of the implementation of a measure stemming from the Tabarot Law, aimed at strengthening everyday security on public transport. At the Gare de Lyon in Paris, France, on December 18, 2025. Photo by Alexis Jumeau/ABACAPRESS.COM

  •  
Illustration of the Gare de Lyon during the Christmas holiday departures - Paris AJ

Illustration of the Gare de Lyon during the Christmas holiday departures - Paris AJ

This photo is an illustration showing Ouigo high-speed trains (TGV) on the station platform during the Minister of Transport's visit, coinciding with the start of the Christmas and New Year holidays, the purpose was to review the security measures deployed during peak travel periods. This visit is part of the implementation of a measure stemming from the Tabarot Law, aimed at strengthening everyday security on public transport. At the Gare de Lyon in Paris, France, on December 18, 2025. Photo by Alexis Jumeau/ABACAPRESS.COM

  •  
Illustration of the Gare de Lyon during the Christmas holiday departures - Paris AJ

Illustration of the Gare de Lyon during the Christmas holiday departures - Paris AJ

This photo is an illustration showing Inoui high-speed trains (TGV) on the station platform during the Minister of Transport's visit, coinciding with the start of the Christmas and New Year holidays, the purpose was to review the security measures deployed during peak travel periods. This visit is part of the implementation of a measure stemming from the Tabarot Law, aimed at strengthening everyday security on public transport. At the Gare de Lyon in Paris, France, on December 18, 2025. Photo by Alexis Jumeau/ABACAPRESS.COM

  •  
Illustration of the Gare de Lyon during the Christmas holiday departures - Paris AJ

Illustration of the Gare de Lyon during the Christmas holiday departures - Paris AJ

This photo is an illustration showing Ouigo high-speed trains (TGV) on the station platform during the Minister of Transport's visit, coinciding with the start of the Christmas and New Year holidays, the purpose was to review the security measures deployed during peak travel periods. This visit is part of the implementation of a measure stemming from the Tabarot Law, aimed at strengthening everyday security on public transport. At the Gare de Lyon in Paris, France, on December 18, 2025. Photo by Alexis Jumeau/ABACAPRESS.COM

  •  
Illustration of the Gare de Lyon during the Christmas holiday departures - Paris AJ

Illustration of the Gare de Lyon during the Christmas holiday departures - Paris AJ

This photo is an illustration showing Ouigo high-speed trains (TGV) on the station platform during the Minister of Transport's visit, coinciding with the start of the Christmas and New Year holidays, the purpose was to review the security measures deployed during peak travel periods. This visit is part of the implementation of a measure stemming from the Tabarot Law, aimed at strengthening everyday security on public transport. At the Gare de Lyon in Paris, France, on December 18, 2025. Photo by Alexis Jumeau/ABACAPRESS.COM

  •  
Illustration of the Gare de Lyon during the Christmas holiday departures - Paris AJ

Illustration of the Gare de Lyon during the Christmas holiday departures - Paris AJ

This photo is an illustration showing Ouigo high-speed trains (TGV) on the station platform during the Minister of Transport's visit, coinciding with the start of the Christmas and New Year holidays, the purpose was to review the security measures deployed during peak travel periods. This visit is part of the implementation of a measure stemming from the Tabarot Law, aimed at strengthening everyday security on public transport. At the Gare de Lyon in Paris, France, on December 18, 2025. Photo by Alexis Jumeau/ABACAPRESS.COM

  •  
Illustration of the Gare de Lyon during the Christmas holiday departures - Paris AJ

Illustration of the Gare de Lyon during the Christmas holiday departures - Paris AJ

This photo is an illustration showing the high-speed train (TGV) operations room at the Gare de Lyon during the Minister of Transport's visit, coinciding with the start of the Christmas and New Year holidays, the purpose was to review the security measures deployed during peak travel periods. This visit is part of the implementation of a measure stemming from the Tabarot Law, aimed at strengthening everyday security on public transport. At the Gare de Lyon in Paris, France, on December 18, 2025. Photo by Alexis Jumeau/ABACAPRESS.COM

  •  

France: Farmers’ Protests Against Mercosur Expand Across Country, Motorway Blockages Continue

Thousands of European farmers are gathering in Brussels today, December 18, to protest the EU-Mercosur trade deal during a high-stakes European Council summit. In France, the unrest has escalated with motorways being blocked and protests expanding toward major ski resort access routes just ahead of tomorrow's scheduled vote on the agreement. This surge in mobilization follows a massive day of action yesterday, which saw over 3,600 farmers participate in at least 80 separate demonstrations across the country.

  •  

Canada: Severe Storm Brings Whiteouts, Dangerous Driving Conditions Across Alberta 4

A powerful winter storm brought whiteout conditions across Alberta on Wednesday, December 17, prompting a province-wide warning against travel on all roads and highways. Police urged residents to stay home, warning that emergency response times could be delayed due to the dangerous conditions.

  •  

Canada: Severe Storm Brings Whiteouts, Dangerous Driving Conditions Across Alberta

A powerful winter storm brought whiteout conditions across Alberta on Wednesday, December 17, prompting a province-wide warning against travel on all roads and highways. Police urged residents to stay home, warning that emergency response times could be delayed due to the dangerous conditions.

  •  

Canada: Severe Storm Brings Whiteouts, Dangerous Driving Conditions Across Alberta 2

A powerful winter storm brought whiteout conditions across Alberta on Wednesday, December 17, prompting a province-wide warning against travel on all roads and highways. Police urged residents to stay home, warning that emergency response times could be delayed due to the dangerous conditions.

  •  

Canada: Severe Storm Brings Whiteouts, Dangerous Driving Conditions Across Alberta 3

A powerful winter storm brought whiteout conditions across Alberta on Wednesday, December 17, prompting a province-wide warning against travel on all roads and highways. Police urged residents to stay home, warning that emergency response times could be delayed due to the dangerous conditions.

  •  
Mossos Prepare to Evict Settlement - Barcelona

Mossos Prepare to Evict Settlement - Barcelona

Several agents of the Mossos d'Esquadra work on the eviction of the B9 of Badalona, on December 17, 2025, in Badalona, Barcelona, Catalonia (Spain). The Mossos d'Esquadra are ready to start the eviction of the former high school B9 in Badalona (Barcelona), converted into an occupied settlement. The eviction is carried out in response to the demand of the Badalona City Council to Mossos d'Esquadra, by means of a judicial resolution of the Contentious Administrative Court number 11 of Barcelona last December 12, "which authorizes the entry and execution of the Government Agreement of the referred City Council to recover the property". Photo by Lorena Sopêna / Europa Press / ABACAPRESS.COM

  •  
Mossos Prepare to Evict Settlement - Barcelona

Mossos Prepare to Evict Settlement - Barcelona

Several people evicted from the B9 of Badalona, on December 17, 2025, in Badalona, Barcelona, Catalonia (Spain). The Mossos d'Esquadra are ready to start the eviction of the former high school B9 in Badalona (Barcelona), converted into an occupied settlement. The eviction is carried out in response to the demand of the Badalona City Council to Mossos d'Esquadra, by means of a judicial resolution of the Contentious Administrative Court number 11 of Barcelona last December 12, "which authorizes the entry and execution of the Government Agreement of the referred City Council to recover the property". Photo by Lorena Sopêna / Europa Press / ABACAPRESS.COM

  •  
Mossos Prepare to Evict Settlement - Barcelona

Mossos Prepare to Evict Settlement - Barcelona

A dog during the eviction of the B9 of Badalona, on December 17, 2025, in Badalona, Barcelona, Catalonia (Spain). The Mossos d'Esquadra are ready to start the eviction of the former high school B9 in Badalona (Barcelona), converted into an occupied settlement. The eviction is carried out in response to the demand of the Badalona City Council to Mossos d'Esquadra, by means of a judicial resolution of the Contentious Administrative Court number 11 of Barcelona last December 12, "which authorizes the entry and execution of the Government Agreement of the referred City Council to recover the property". Photo by Lorena Sopêna / Europa Press / ABACAPRESS.COM

  •  
Mossos Prepare to Evict Settlement - Barcelona

Mossos Prepare to Evict Settlement - Barcelona

Several people evicted from the B9 of Badalona, on December 17, 2025, in Badalona, Barcelona, Catalonia (Spain). The Mossos d'Esquadra are ready to start the eviction of the former high school B9 in Badalona (Barcelona), converted into an occupied settlement. The eviction is carried out in response to the demand of the Badalona City Council to Mossos d'Esquadra, by means of a judicial resolution of the Contentious Administrative Court number 11 of Barcelona last December 12, "which authorizes the entry and execution of the Government Agreement of the referred City Council to recover the property". Photo by Lorena Sopêna / Europa Press / ABACAPRESS.COM

  •  
Mossos Prepare to Evict Settlement - Barcelona

Mossos Prepare to Evict Settlement - Barcelona

Several people evicted from the B9 of Badalona, on December 17, 2025, in Badalona, Barcelona, Catalonia (Spain). The Mossos d'Esquadra are ready to start the eviction of the former high school B9 in Badalona (Barcelona), converted into an occupied settlement. The eviction is carried out in response to the demand of the Badalona City Council to Mossos d'Esquadra, by means of a judicial resolution of the Contentious Administrative Court number 11 of Barcelona last December 12, "which authorizes the entry and execution of the Government Agreement of the referred City Council to recover the property". Photo by Lorena Sopêna / Europa Press / ABACAPRESS.COM

  •  
Mossos Prepare to Evict Settlement - Barcelona

Mossos Prepare to Evict Settlement - Barcelona

Several people protest to prevent the eviction of the B9 of Badalona, on December 17, 2025, in Badalona, Barcelona, Catalonia (Spain). The Mossos d'Esquadra are ready to start the eviction of the former high school B9 in Badalona (Barcelona), converted into an occupied settlement. The eviction is carried out in response to the demand of the Badalona City Council to Mossos d'Esquadra, by means of a judicial resolution of the Contentious Administrative Court number 11 of Barcelona last December 12, "which authorizes the entry and execution of the Government Agreement of the referred City Council to recover the property". Photo by Lorena Sopêna / Europa Press / ABACAPRESS.COM

  •  
Mossos Prepare to Evict Settlement - Barcelona

Mossos Prepare to Evict Settlement - Barcelona

Several agents of the Mossos d'Esquadra work on the eviction of the B9 of Badalona, on December 17, 2025, in Badalona, Barcelona, Catalonia (Spain). The Mossos d'Esquadra are ready to start the eviction of the former high school B9 in Badalona (Barcelona), converted into an occupied settlement. The eviction is carried out in response to the demand of the Badalona City Council to Mossos d'Esquadra, by means of a judicial resolution of the Contentious Administrative Court number 11 of Barcelona last December 12, "which authorizes the entry and execution of the Government Agreement of the referred City Council to recover the property". Photo by Lorena Sopêna / Europa Press / ABACAPRESS.COM

  •  
Mossos Prepare to Evict Settlement - Barcelona

Mossos Prepare to Evict Settlement - Barcelona

A man rebukes the Mossos d'Esquadra working on the eviction of the B9 of Badalona, on December 17, 2025, in Badalona, Barcelona, Catalonia (Spain). The Mossos d'Esquadra are ready to start the eviction of the former high school B9 in Badalona (Barcelona), converted into an occupied settlement. The eviction is carried out in response to the demand of the Badalona City Council to Mossos d'Esquadra, by means of a judicial resolution of the Contentious Administrative Court number 11 of Barcelona last December 12, "which authorizes the entry and execution of the Government Agreement of the referred City Council to recover the property". Photo by Lorena Sopêna / Europa Press / ABACAPRESS.COM

  •  
Mossos Prepare to Evict Settlement - Barcelona

Mossos Prepare to Evict Settlement - Barcelona

Several agents of the Mossos d'Esquadra work on the eviction of the B9 of Badalona, on December 17, 2025, in Badalona, Barcelona, Catalonia (Spain). The Mossos d'Esquadra are ready to start the eviction of the former high school B9 in Badalona (Barcelona), converted into an occupied settlement. The eviction is carried out in response to the demand of the Badalona City Council to Mossos d'Esquadra, by means of a judicial resolution of the Contentious Administrative Court number 11 of Barcelona last December 12, "which authorizes the entry and execution of the Government Agreement of the referred City Council to recover the property". Photo by Lorena Sopêna / Europa Press / ABACAPRESS.COM

  •  
Mossos Prepare to Evict Settlement - Barcelona

Mossos Prepare to Evict Settlement - Barcelona

Several agents of the Mossos d'Esquadra work on the eviction of the B9 of Badalona, on December 17, 2025, in Badalona, Barcelona, Catalonia (Spain). The Mossos d'Esquadra are ready to start the eviction of the former high school B9 in Badalona (Barcelona), converted into an occupied settlement. The eviction is carried out in response to the demand of the Badalona City Council to Mossos d'Esquadra, by means of a judicial resolution of the Contentious Administrative Court number 11 of Barcelona last December 12, "which authorizes the entry and execution of the Government Agreement of the referred City Council to recover the property". Photo by Lorena Sopêna / Europa Press / ABACAPRESS.COM

  •  
Mossos Prepare to Evict Settlement - Barcelona

Mossos Prepare to Evict Settlement - Barcelona

Several agents of the Mossos d'Esquadra work on the eviction of the B9 of Badalona, on December 17, 2025, in Badalona, Barcelona, Catalonia (Spain). The Mossos d'Esquadra are ready to start the eviction of the former high school B9 in Badalona (Barcelona), converted into an occupied settlement. The eviction is carried out in response to the demand of the Badalona City Council to Mossos d'Esquadra, by means of a judicial resolution of the Contentious Administrative Court number 11 of Barcelona last December 12, "which authorizes the entry and execution of the Government Agreement of the referred City Council to recover the property". Photo by Lorena Sopêna / Europa Press / ABACAPRESS.COM

  •  
Mossos Prepare to Evict Settlement - Barcelona

Mossos Prepare to Evict Settlement - Barcelona

A man rebukes the Mossos d'Esquadra working on the eviction of the B9 of Badalona, on December 17, 2025, in Badalona, Barcelona, Catalonia (Spain). The Mossos d'Esquadra are ready to start the eviction of the former high school B9 in Badalona (Barcelona), converted into an occupied settlement. The eviction is carried out in response to the demand of the Badalona City Council to Mossos d'Esquadra, by means of a judicial resolution of the Contentious Administrative Court number 11 of Barcelona last December 12, "which authorizes the entry and execution of the Government Agreement of the referred City Council to recover the property". Photo by Lorena Sopêna / Europa Press / ABACAPRESS.COM

  •  
Mossos Prepare to Evict Settlement - Barcelona

Mossos Prepare to Evict Settlement - Barcelona

A man rebukes the Mossos d'Esquadra working on the eviction of the B9 of Badalona, on December 17, 2025, in Badalona, Barcelona, Catalonia (Spain). The Mossos d'Esquadra are ready to start the eviction of the former high school B9 in Badalona (Barcelona), converted into an occupied settlement. The eviction is carried out in response to the demand of the Badalona City Council to Mossos d'Esquadra, by means of a judicial resolution of the Contentious Administrative Court number 11 of Barcelona last December 12, "which authorizes the entry and execution of the Government Agreement of the referred City Council to recover the property". Photo by Lorena Sopêna / Europa Press / ABACAPRESS.COM

  •  
Mossos Prepare to Evict Settlement - Barcelona

Mossos Prepare to Evict Settlement - Barcelona

Several people evicted from the B9 of Badalona, on December 17, 2025, in Badalona, Barcelona, Catalonia (Spain). The Mossos d'Esquadra are ready to start the eviction of the former high school B9 in Badalona (Barcelona), converted into an occupied settlement. The eviction is carried out in response to the demand of the Badalona City Council to Mossos d'Esquadra, by means of a judicial resolution of the Contentious Administrative Court number 11 of Barcelona last December 12, "which authorizes the entry and execution of the Government Agreement of the referred City Council to recover the property". Photo by Lorena Sopêna / Europa Press / ABACAPRESS.COM

  •  
Metax Stock

Metax Stock

Viewers watch Metax's high-density AI computing cabinet at the World Artificial Intelligence Conference in Shanghai, China on July 28, 2025.

  •  
HIECO 2025 AI Innovation Conference

HIECO 2025 AI Innovation Conference

Audiences are watching the products of high-voltage DC distribution units at the HIECO 2025 AI Innovation Conference in Suzhou, Jiangsu Province, China on December 17, 2025.

  •  
Offshore Grain Warehouse Construction in Lianyungang

Offshore Grain Warehouse Construction in Lianyungang

LIANYUNGANG, CHINA - DECEMBER 17, 2025 - The construction site of the soon to be put into use Phase I project, captured at the International Grain Distribution Center in Lianyungang City, Jiangsu Province, China on December 17, 2025. The inner diameter of the single warehouse reaches 16.5 meters, and the height is as high as 52.5 meters. Both adopt a reinforced concrete circular warehouse structure, covering an area of over 11000 square meters. The positioning is to create a nationally renowned "offshore grain warehouse" of tens of millions of tons.

  •  
Offshore Grain Warehouse Construction in Lianyungang

Offshore Grain Warehouse Construction in Lianyungang

LIANYUNGANG, CHINA - DECEMBER 17, 2025 - The construction site of the soon to be put into use Phase I project, captured at the International Grain Distribution Center in Lianyungang City, Jiangsu Province, China on December 17, 2025. The inner diameter of the single warehouse reaches 16.5 meters, and the height is as high as 52.5 meters. Both adopt a reinforced concrete circular warehouse structure, covering an area of over 11000 square meters. The positioning is to create a nationally renowned "offshore grain warehouse" of tens of millions of tons.

  •  
Offshore Grain Warehouse Construction in Lianyungang

Offshore Grain Warehouse Construction in Lianyungang

LIANYUNGANG, CHINA - DECEMBER 17, 2025 - The construction site of the soon to be put into use Phase I project, captured at the International Grain Distribution Center in Lianyungang City, Jiangsu Province, China on December 17, 2025. The inner diameter of the single warehouse reaches 16.5 meters, and the height is as high as 52.5 meters. Both adopt a reinforced concrete circular warehouse structure, covering an area of over 11000 square meters. The positioning is to create a nationally renowned "offshore grain warehouse" of tens of millions of tons.

  •  
Offshore Grain Warehouse Construction in Lianyungang

Offshore Grain Warehouse Construction in Lianyungang

LIANYUNGANG, CHINA - DECEMBER 17, 2025 - The construction site of the soon to be put into use Phase I project, captured at the International Grain Distribution Center in Lianyungang City, Jiangsu Province, China on December 17, 2025. The inner diameter of the single warehouse reaches 16.5 meters, and the height is as high as 52.5 meters. Both adopt a reinforced concrete circular warehouse structure, covering an area of over 11000 square meters. The positioning is to create a nationally renowned "offshore grain warehouse" of tens of millions of tons.

  •  
Offshore Grain Warehouse Construction in Lianyungang

Offshore Grain Warehouse Construction in Lianyungang

LIANYUNGANG, CHINA - DECEMBER 17, 2025 - The construction site of the soon to be put into use Phase I project, captured at the International Grain Distribution Center in Lianyungang City, Jiangsu Province, China on December 17, 2025. The inner diameter of the single warehouse reaches 16.5 meters, and the height is as high as 52.5 meters. Both adopt a reinforced concrete circular warehouse structure, covering an area of over 11000 square meters. The positioning is to create a nationally renowned "offshore grain warehouse" of tens of millions of tons.

  •  
Offshore Grain Warehouse Construction in Lianyungang

Offshore Grain Warehouse Construction in Lianyungang

LIANYUNGANG, CHINA - DECEMBER 17, 2025 - The construction site of the soon to be put into use Phase I project, captured at the International Grain Distribution Center in Lianyungang City, Jiangsu Province, China on December 17, 2025. The inner diameter of the single warehouse reaches 16.5 meters, and the height is as high as 52.5 meters. Both adopt a reinforced concrete circular warehouse structure, covering an area of over 11000 square meters. The positioning is to create a nationally renowned "offshore grain warehouse" of tens of millions of tons.

  •  
Offshore Grain Warehouse Construction in Lianyungang

Offshore Grain Warehouse Construction in Lianyungang

LIANYUNGANG, CHINA - DECEMBER 17, 2025 - The construction site of the soon to be put into use Phase I project, captured at the International Grain Distribution Center in Lianyungang City, Jiangsu Province, China on December 17, 2025. The inner diameter of the single warehouse reaches 16.5 meters, and the height is as high as 52.5 meters. Both adopt a reinforced concrete circular warehouse structure, covering an area of over 11000 square meters. The positioning is to create a nationally renowned "offshore grain warehouse" of tens of millions of tons.

  •  
Offshore Grain Warehouse Construction in Lianyungang

Offshore Grain Warehouse Construction in Lianyungang

LIANYUNGANG, CHINA - DECEMBER 17, 2025 - The construction site of the soon to be put into use Phase I project, captured at the International Grain Distribution Center in Lianyungang City, Jiangsu Province, China on December 17, 2025. The inner diameter of the single warehouse reaches 16.5 meters, and the height is as high as 52.5 meters. Both adopt a reinforced concrete circular warehouse structure, covering an area of over 11000 square meters. The positioning is to create a nationally renowned "offshore grain warehouse" of tens of millions of tons.

  •  
Offshore Grain Warehouse Construction in Lianyungang

Offshore Grain Warehouse Construction in Lianyungang

LIANYUNGANG, CHINA - DECEMBER 17, 2025 - The construction site of the soon to be put into use Phase I project, captured at the International Grain Distribution Center in Lianyungang City, Jiangsu Province, China on December 17, 2025. The inner diameter of the single warehouse reaches 16.5 meters, and the height is as high as 52.5 meters. Both adopt a reinforced concrete circular warehouse structure, covering an area of over 11000 square meters. The positioning is to create a nationally renowned "offshore grain warehouse" of tens of millions of tons.

  •  
Offshore Grain Warehouse Construction in Lianyungang

Offshore Grain Warehouse Construction in Lianyungang

LIANYUNGANG, CHINA - DECEMBER 17, 2025 - The construction site of the soon to be put into use Phase I project, captured at the International Grain Distribution Center in Lianyungang City, Jiangsu Province, China on December 17, 2025. The inner diameter of the single warehouse reaches 16.5 meters, and the height is as high as 52.5 meters. Both adopt a reinforced concrete circular warehouse structure, covering an area of over 11000 square meters. The positioning is to create a nationally renowned "offshore grain warehouse" of tens of millions of tons.

  •  
Offshore Grain Warehouse Construction in Lianyungang

Offshore Grain Warehouse Construction in Lianyungang

LIANYUNGANG, CHINA - DECEMBER 17, 2025 - The construction site of the soon to be put into use Phase I project, captured at the International Grain Distribution Center in Lianyungang City, Jiangsu Province, China on December 17, 2025. The inner diameter of the single warehouse reaches 16.5 meters, and the height is as high as 52.5 meters. Both adopt a reinforced concrete circular warehouse structure, covering an area of over 11000 square meters. The positioning is to create a nationally renowned "offshore grain warehouse" of tens of millions of tons.

  •  
Offshore Grain Warehouse Construction in Lianyungang

Offshore Grain Warehouse Construction in Lianyungang

LIANYUNGANG, CHINA - DECEMBER 17, 2025 - The construction site of the soon to be put into use Phase I project, captured at the International Grain Distribution Center in Lianyungang City, Jiangsu Province, China on December 17, 2025. The inner diameter of the single warehouse reaches 16.5 meters, and the height is as high as 52.5 meters. Both adopt a reinforced concrete circular warehouse structure, covering an area of over 11000 square meters. The positioning is to create a nationally renowned "offshore grain warehouse" of tens of millions of tons.

  •  
Offshore Grain Warehouse Construction in Lianyungang

Offshore Grain Warehouse Construction in Lianyungang

LIANYUNGANG, CHINA - DECEMBER 17, 2025 - The construction site of the soon to be put into use Phase I project, captured at the International Grain Distribution Center in Lianyungang City, Jiangsu Province, China on December 17, 2025. The inner diameter of the single warehouse reaches 16.5 meters, and the height is as high as 52.5 meters. Both adopt a reinforced concrete circular warehouse structure, covering an area of over 11000 square meters. The positioning is to create a nationally renowned "offshore grain warehouse" of tens of millions of tons.

  •  
Offshore Grain Warehouse Construction in Lianyungang

Offshore Grain Warehouse Construction in Lianyungang

LIANYUNGANG, CHINA - DECEMBER 17, 2025 - The construction site of the soon to be put into use Phase I project, captured at the International Grain Distribution Center in Lianyungang City, Jiangsu Province, China on December 17, 2025. The inner diameter of the single warehouse reaches 16.5 meters, and the height is as high as 52.5 meters. Both adopt a reinforced concrete circular warehouse structure, covering an area of over 11000 square meters. The positioning is to create a nationally renowned "offshore grain warehouse" of tens of millions of tons.

  •  
Offshore Grain Warehouse Construction in Lianyungang

Offshore Grain Warehouse Construction in Lianyungang

LIANYUNGANG, CHINA - DECEMBER 17, 2025 - The construction site of the soon to be put into use Phase I project, captured at the International Grain Distribution Center in Lianyungang City, Jiangsu Province, China on December 17, 2025. The inner diameter of the single warehouse reaches 16.5 meters, and the height is as high as 52.5 meters. Both adopt a reinforced concrete circular warehouse structure, covering an area of over 11000 square meters. The positioning is to create a nationally renowned "offshore grain warehouse" of tens of millions of tons.

  •  
Offshore Grain Warehouse Construction in Lianyungang

Offshore Grain Warehouse Construction in Lianyungang

LIANYUNGANG, CHINA - DECEMBER 17, 2025 - The construction site of the soon to be put into use Phase I project, captured at the International Grain Distribution Center in Lianyungang City, Jiangsu Province, China on December 17, 2025. The inner diameter of the single warehouse reaches 16.5 meters, and the height is as high as 52.5 meters. Both adopt a reinforced concrete circular warehouse structure, covering an area of over 11000 square meters. The positioning is to create a nationally renowned "offshore grain warehouse" of tens of millions of tons.

  •  
Offshore Grain Warehouse Construction in Lianyungang

Offshore Grain Warehouse Construction in Lianyungang

LIANYUNGANG, CHINA - DECEMBER 17, 2025 - The construction site of the soon to be put into use Phase I project, captured at the International Grain Distribution Center in Lianyungang City, Jiangsu Province, China on December 17, 2025. The inner diameter of the single warehouse reaches 16.5 meters, and the height is as high as 52.5 meters. Both adopt a reinforced concrete circular warehouse structure, covering an area of over 11000 square meters. The positioning is to create a nationally renowned "offshore grain warehouse" of tens of millions of tons.

  •  
Offshore Grain Warehouse Construction in Lianyungang

Offshore Grain Warehouse Construction in Lianyungang

LIANYUNGANG, CHINA - DECEMBER 17, 2025 - The construction site of the soon to be put into use Phase I project, captured at the International Grain Distribution Center in Lianyungang City, Jiangsu Province, China on December 17, 2025. The inner diameter of the single warehouse reaches 16.5 meters, and the height is as high as 52.5 meters. Both adopt a reinforced concrete circular warehouse structure, covering an area of over 11000 square meters. The positioning is to create a nationally renowned "offshore grain warehouse" of tens of millions of tons.

  •  
Offshore Grain Warehouse Construction in Lianyungang

Offshore Grain Warehouse Construction in Lianyungang

LIANYUNGANG, CHINA - DECEMBER 17, 2025 - The construction site of the soon to be put into use Phase I project, captured at the International Grain Distribution Center in Lianyungang City, Jiangsu Province, China on December 17, 2025. The inner diameter of the single warehouse reaches 16.5 meters, and the height is as high as 52.5 meters. Both adopt a reinforced concrete circular warehouse structure, covering an area of over 11000 square meters. The positioning is to create a nationally renowned "offshore grain warehouse" of tens of millions of tons.

  •  
Offshore Grain Warehouse Construction in Lianyungang

Offshore Grain Warehouse Construction in Lianyungang

LIANYUNGANG, CHINA - DECEMBER 17, 2025 - The construction site of the soon to be put into use Phase I project, captured at the International Grain Distribution Center in Lianyungang City, Jiangsu Province, China on December 17, 2025. The inner diameter of the single warehouse reaches 16.5 meters, and the height is as high as 52.5 meters. Both adopt a reinforced concrete circular warehouse structure, covering an area of over 11000 square meters. The positioning is to create a nationally renowned "offshore grain warehouse" of tens of millions of tons.

  •  
Offshore Grain Warehouse Construction in Lianyungang

Offshore Grain Warehouse Construction in Lianyungang

LIANYUNGANG, CHINA - DECEMBER 17, 2025 - The construction site of the soon to be put into use Phase I project, captured at the International Grain Distribution Center in Lianyungang City, Jiangsu Province, China on December 17, 2025. The inner diameter of the single warehouse reaches 16.5 meters, and the height is as high as 52.5 meters. Both adopt a reinforced concrete circular warehouse structure, covering an area of over 11000 square meters. The positioning is to create a nationally renowned "offshore grain warehouse" of tens of millions of tons.

  •  
Offshore Grain Warehouse Construction in Lianyungang

Offshore Grain Warehouse Construction in Lianyungang

LIANYUNGANG, CHINA - DECEMBER 17, 2025 - The construction site of the soon to be put into use Phase I project, captured at the International Grain Distribution Center in Lianyungang City, Jiangsu Province, China on December 17, 2025. The inner diameter of the single warehouse reaches 16.5 meters, and the height is as high as 52.5 meters. Both adopt a reinforced concrete circular warehouse structure, covering an area of over 11000 square meters. The positioning is to create a nationally renowned "offshore grain warehouse" of tens of millions of tons.

  • Main
  • Top
  • Editorial
  • Creative
  • About Us
  • About ILG
  • Terms of use
  • Company
  • BEHIND
  • Price List
  • Single Plan
  • Monthly Plan
  • Services
  • Shooting
  • Rights Clearance
  • Support
  • FAQ
  • How To Buy
  • Contact Us
  • Become a Partner

© KYODO NEWS IMAGES INC

All Rights Reserved.

  • Editorial
  • Olympics
  • News
  • Sports
  • Japan
  • Tech
  • Royal
  • Disaster
  • NorthKorea
  • Old Japan
  • SNS
  • Creative
  • Food
  • Japan
  • Landscape
  • Animal
  • Popular
  • #Ukraine
  • #Thailand
  • #coronavirus
  • #N. Korea
  • #Russia
  • #China
  • #Ukraine
  • #Thailand
  • #coronavirus
  • #N. Korea
  • #Russia
  • #China
  • Food
  • Japan
  • Landscape
  • Animal
  • Olympics
  • News
  • Sports
  • Japan
  • Tech
  • Royal
  • Disaster
  • NorthKorea
  • Old Japan
  • SNS