•  
Visit to the works of the Galindo Storm Tank - Barakaldo

Visit to the works of the Galindo Storm Tank - Barakaldo

Several people work during a visit to the construction site of the Galindo Storm Tank, December 5, 2025, in Barakaldo, Biscay, Basque Country, Spain. The subway hydraulic infrastructure is designed to store excess rainwater to prevent untreated wastewater from reaching rivers, reducing flooding and improving water quality. The project has an investment of more than 46 million euros and is scheduled for completion by the end of 2027. Photo by H.Bilbao / Europa Press/ABACAPRESS.COM

  •  
Visit to the works of the Galindo Storm Tank - Barakaldo

Visit to the works of the Galindo Storm Tank - Barakaldo

Several people work during a visit to the construction site of the Galindo Storm Tank, December 5, 2025, in Barakaldo, Biscay, Basque Country, Spain. The subway hydraulic infrastructure is designed to store excess rainwater to prevent untreated wastewater from reaching rivers, reducing flooding and improving water quality. The project has an investment of more than 46 million euros and is scheduled for completion by the end of 2027. Photo by H.Bilbao / Europa Press/ABACAPRESS.COM

  •  
Visit to the works of the Galindo Storm Tank - Barakaldo

Visit to the works of the Galindo Storm Tank - Barakaldo

Several people work during a visit to the construction site of the Galindo Storm Tank, December 5, 2025, in Barakaldo, Biscay, Basque Country, Spain. The subway hydraulic infrastructure is designed to store excess rainwater to prevent untreated wastewater from reaching rivers, reducing flooding and improving water quality. The project has an investment of more than 46 million euros and is scheduled for completion by the end of 2027. Photo by H.Bilbao / Europa Press/ABACAPRESS.COM

  •  
Visit to the works of the Galindo Storm Tank - Barakaldo

Visit to the works of the Galindo Storm Tank - Barakaldo

Several people work during a visit to the construction site of the Galindo Storm Tank, December 5, 2025, in Barakaldo, Biscay, Basque Country, Spain. The subway hydraulic infrastructure is designed to store excess rainwater to prevent untreated wastewater from reaching rivers, reducing flooding and improving water quality. The project has an investment of more than 46 million euros and is scheduled for completion by the end of 2027. Photo by H.Bilbao / Europa Press/ABACAPRESS.COM

  •  
Visit to the works of the Galindo Storm Tank - Barakaldo

Visit to the works of the Galindo Storm Tank - Barakaldo

Several people work during a visit to the construction site of the Galindo Storm Tank, December 5, 2025, in Barakaldo, Biscay, Basque Country, Spain. The subway hydraulic infrastructure is designed to store excess rainwater to prevent untreated wastewater from reaching rivers, reducing flooding and improving water quality. The project has an investment of more than 46 million euros and is scheduled for completion by the end of 2027. Photo by H.Bilbao / Europa Press/ABACAPRESS.COM

  •  
Visit to the works of the Galindo Storm Tank - Barakaldo

Visit to the works of the Galindo Storm Tank - Barakaldo

Several people work during a visit to the construction site of the Galindo Storm Tank, December 5, 2025, in Barakaldo, Biscay, Basque Country, Spain. The subway hydraulic infrastructure is designed to store excess rainwater to prevent untreated wastewater from reaching rivers, reducing flooding and improving water quality. The project has an investment of more than 46 million euros and is scheduled for completion by the end of 2027. Photo by H.Bilbao / Europa Press/ABACAPRESS.COM

  •  
Visit to the works of the Galindo Storm Tank - Barakaldo

Visit to the works of the Galindo Storm Tank - Barakaldo

Several people work during a visit to the construction site of the Galindo Storm Tank, December 5, 2025, in Barakaldo, Biscay, Basque Country, Spain. The subway hydraulic infrastructure is designed to store excess rainwater to prevent untreated wastewater from reaching rivers, reducing flooding and improving water quality. The project has an investment of more than 46 million euros and is scheduled for completion by the end of 2027. Photo by H.Bilbao / Europa Press/ABACAPRESS.COM

  •  
Visit to the works of the Galindo Storm Tank - Barakaldo

Visit to the works of the Galindo Storm Tank - Barakaldo

Several people work during a visit to the construction site of the Galindo Storm Tank, December 5, 2025, in Barakaldo, Biscay, Basque Country, Spain. The subway hydraulic infrastructure is designed to store excess rainwater to prevent untreated wastewater from reaching rivers, reducing flooding and improving water quality. The project has an investment of more than 46 million euros and is scheduled for completion by the end of 2027. Photo by H.Bilbao / Europa Press/ABACAPRESS.COM

  •  
Visit to the works of the Galindo Storm Tank - Barakaldo

Visit to the works of the Galindo Storm Tank - Barakaldo

Several people work during a visit to the construction site of the Galindo Storm Tank, December 5, 2025, in Barakaldo, Biscay, Basque Country, Spain. The subway hydraulic infrastructure is designed to store excess rainwater to prevent untreated wastewater from reaching rivers, reducing flooding and improving water quality. The project has an investment of more than 46 million euros and is scheduled for completion by the end of 2027. Photo by H.Bilbao / Europa Press/ABACAPRESS.COM

  •  
Visit to the works of the Galindo Storm Tank - Barakaldo

Visit to the works of the Galindo Storm Tank - Barakaldo

Several people work during a visit to the construction site of the Galindo Storm Tank, December 5, 2025, in Barakaldo, Biscay, Basque Country, Spain. The subway hydraulic infrastructure is designed to store excess rainwater to prevent untreated wastewater from reaching rivers, reducing flooding and improving water quality. The project has an investment of more than 46 million euros and is scheduled for completion by the end of 2027. Photo by H.Bilbao / Europa Press/ABACAPRESS.COM

  •  
Visit to the works of the Galindo Storm Tank - Barakaldo

Visit to the works of the Galindo Storm Tank - Barakaldo

Several people work during a visit to the construction site of the Galindo Storm Tank, December 5, 2025, in Barakaldo, Biscay, Basque Country, Spain. The subway hydraulic infrastructure is designed to store excess rainwater to prevent untreated wastewater from reaching rivers, reducing flooding and improving water quality. The project has an investment of more than 46 million euros and is scheduled for completion by the end of 2027. Photo by H.Bilbao / Europa Press/ABACAPRESS.COM

  •  
Visit to the works of the Galindo Storm Tank - Barakaldo

Visit to the works of the Galindo Storm Tank - Barakaldo

Several people work during a visit to the construction site of the Galindo Storm Tank, December 5, 2025, in Barakaldo, Biscay, Basque Country, Spain. The subway hydraulic infrastructure is designed to store excess rainwater to prevent untreated wastewater from reaching rivers, reducing flooding and improving water quality. The project has an investment of more than 46 million euros and is scheduled for completion by the end of 2027. Photo by H.Bilbao / Europa Press/ABACAPRESS.COM

  •  
Visit to the works of the Galindo Storm Tank - Barakaldo

Visit to the works of the Galindo Storm Tank - Barakaldo

Several people work during a visit to the construction site of the Galindo Storm Tank, December 5, 2025, in Barakaldo, Biscay, Basque Country, Spain. The subway hydraulic infrastructure is designed to store excess rainwater to prevent untreated wastewater from reaching rivers, reducing flooding and improving water quality. The project has an investment of more than 46 million euros and is scheduled for completion by the end of 2027. Photo by H.Bilbao / Europa Press/ABACAPRESS.COM

  •  
Visit to the works of the Galindo Storm Tank - Barakaldo

Visit to the works of the Galindo Storm Tank - Barakaldo

Several people work during a visit to the construction site of the Galindo Storm Tank, December 5, 2025, in Barakaldo, Biscay, Basque Country, Spain. The subway hydraulic infrastructure is designed to store excess rainwater to prevent untreated wastewater from reaching rivers, reducing flooding and improving water quality. The project has an investment of more than 46 million euros and is scheduled for completion by the end of 2027. Photo by H.Bilbao / Europa Press/ABACAPRESS.COM

  •  
Visit to the works of the Galindo Storm Tank - Barakaldo

Visit to the works of the Galindo Storm Tank - Barakaldo

Several people work during a visit to the construction site of the Galindo Storm Tank, December 5, 2025, in Barakaldo, Biscay, Basque Country, Spain. The subway hydraulic infrastructure is designed to store excess rainwater to prevent untreated wastewater from reaching rivers, reducing flooding and improving water quality. The project has an investment of more than 46 million euros and is scheduled for completion by the end of 2027. Photo by H.Bilbao / Europa Press/ABACAPRESS.COM

  •  
Visit to the works of the Galindo Storm Tank - Barakaldo

Visit to the works of the Galindo Storm Tank - Barakaldo

Several people work during a visit to the construction site of the Galindo Storm Tank, December 5, 2025, in Barakaldo, Biscay, Basque Country, Spain. The subway hydraulic infrastructure is designed to store excess rainwater to prevent untreated wastewater from reaching rivers, reducing flooding and improving water quality. The project has an investment of more than 46 million euros and is scheduled for completion by the end of 2027. Photo by H.Bilbao / Europa Press/ABACAPRESS.COM

  •  
Visit to the works of the Galindo Storm Tank - Barakaldo

Visit to the works of the Galindo Storm Tank - Barakaldo

Several people work during a visit to the construction site of the Galindo Storm Tank, December 5, 2025, in Barakaldo, Biscay, Basque Country, Spain. The subway hydraulic infrastructure is designed to store excess rainwater to prevent untreated wastewater from reaching rivers, reducing flooding and improving water quality. The project has an investment of more than 46 million euros and is scheduled for completion by the end of 2027. Photo by H.Bilbao / Europa Press/ABACAPRESS.COM

  •  
Illustration - Logos - World Nuclear Exhibition 2025

Illustration - Logos - World Nuclear Exhibition 2025

Illustration of the BOUYGUES Travaux Publics logo, Company specializing in the construction of tunnels, engineering structures, and road, port, and rail infrastructure, at the World Nuclear Exhibition at the Villepinte Exhibition Center on November 4, 2025. Photo by Tomas Stevens/ABACAPRESS.COM

  •  
Renewable Energy Infrastructure Construction

Renewable Energy Infrastructure Construction

NANTONG, CHINA - OCTOBER 29, 2025 - Workers are building wind power installation ships at the Qinshi Jiamei Energy Technology (Nantong) Co., Ltd. dock in Tongzhou Bay High end Equipment Lingang Industrial Park, Nantong City, Jiangsu Province, China on October 29th, 2025.

  •  
Renewable Energy Infrastructure Construction

Renewable Energy Infrastructure Construction

NANTONG, CHINA - OCTOBER 29, 2025 - Workers are building wind power installation ships at the Qinshi Jiamei Energy Technology (Nantong) Co., Ltd. dock in Tongzhou Bay High end Equipment Lingang Industrial Park, Nantong City, Jiangsu Province, China on October 29th, 2025.

  •  
Renewable Energy Infrastructure Construction

Renewable Energy Infrastructure Construction

NANTONG, CHINA - OCTOBER 29, 2025 - Workers are building wind power installation ships at the Qinshi Jiamei Energy Technology (Nantong) Co., Ltd. dock in Tongzhou Bay High end Equipment Lingang Industrial Park, Nantong City, Jiangsu Province, China on October 29th, 2025.

  •  
Renewable Energy Infrastructure Construction

Renewable Energy Infrastructure Construction

NANTONG, CHINA - OCTOBER 29, 2025 - Workers are building wind power installation ships at the Qinshi Jiamei Energy Technology (Nantong) Co., Ltd. dock in Tongzhou Bay High end Equipment Lingang Industrial Park, Nantong City, Jiangsu Province, China on October 29th, 2025.

  •  
Renewable Energy Infrastructure Construction

Renewable Energy Infrastructure Construction

NANTONG, CHINA - OCTOBER 29, 2025 - Workers are building wind power installation ships at the Qinshi Jiamei Energy Technology (Nantong) Co., Ltd. dock in Tongzhou Bay High end Equipment Lingang Industrial Park, Nantong City, Jiangsu Province, China on October 29th, 2025.

  •  
Renewable Energy Infrastructure Construction

Renewable Energy Infrastructure Construction

NANTONG, CHINA - OCTOBER 29, 2025 - Workers are building wind power installation ships at the Qinshi Jiamei Energy Technology (Nantong) Co., Ltd. dock in Tongzhou Bay High end Equipment Lingang Industrial Park, Nantong City, Jiangsu Province, China on October 29th, 2025.

  •  
Renewable Energy Infrastructure Construction

Renewable Energy Infrastructure Construction

NANTONG, CHINA - OCTOBER 29, 2025 - Workers are building wind power installation ships at the Qinshi Jiamei Energy Technology (Nantong) Co., Ltd. dock in Tongzhou Bay High end Equipment Lingang Industrial Park, Nantong City, Jiangsu Province, China on October 29th, 2025.

  •  
Renewable Energy Infrastructure Construction

Renewable Energy Infrastructure Construction

NANTONG, CHINA - OCTOBER 29, 2025 - Workers are building wind power installation ships at the Qinshi Jiamei Energy Technology (Nantong) Co., Ltd. dock in Tongzhou Bay High end Equipment Lingang Industrial Park, Nantong City, Jiangsu Province, China on October 29th, 2025.

  •  
Renewable Energy Infrastructure Construction

Renewable Energy Infrastructure Construction

NANTONG, CHINA - OCTOBER 29, 2025 - Workers are building wind power installation ships at the Qinshi Jiamei Energy Technology (Nantong) Co., Ltd. dock in Tongzhou Bay High end Equipment Lingang Industrial Park, Nantong City, Jiangsu Province, China on October 29th, 2025.

  •  
President Claudia Sheinbaum Holds Briefing - Mexico

President Claudia Sheinbaum Holds Briefing - Mexico

Secretary of Infrastructure, Communications, and Transportation, Jesus Esteva Medina, speaks about the progress of the construction of the National Passenger Train Network during a press conference at the National Palace.on October 22, 2025, in Mexico City, Mexico. (Photo by Luis Barron/Eyepix Group/ABACAPRESS.COM)

  •  
Drones Facilitate Infrastructure Construction

Drones Facilitate Infrastructure Construction

HANGZHOU, CHINA - OCTOBER 22, 2025 - Construction workers operate four heavy-duty drones to lift tower materials at the site of the Gansu - Zhejiang 。タ 800 kV HVDC transmission line project in Hangzhou, Zhejiang Province, China on October 22, 2025.

  •  
Drones Facilitate Infrastructure Construction

Drones Facilitate Infrastructure Construction

HANGZHOU, CHINA - OCTOBER 22, 2025 - Construction workers operate four heavy-duty drones to lift tower materials at the site of the Gansu - Zhejiang 。タ 800 kV HVDC transmission line project in Hangzhou, Zhejiang Province, China on October 22, 2025.

  •  
Drones Facilitate Infrastructure Construction

Drones Facilitate Infrastructure Construction

HANGZHOU, CHINA - OCTOBER 22, 2025 - Construction workers operate four heavy-duty drones to lift tower materials at the site of the Gansu - Zhejiang 。タ 800 kV HVDC transmission line project in Hangzhou, Zhejiang Province, China on October 22, 2025.

  •  
Drones Facilitate Infrastructure Construction

Drones Facilitate Infrastructure Construction

HANGZHOU, CHINA - OCTOBER 22, 2025 - Construction workers operate four heavy-duty drones to lift tower materials at the site of the Gansu - Zhejiang 。タ 800 kV HVDC transmission line project in Hangzhou, Zhejiang Province, China on October 22, 2025.

  •  
Drones Facilitate Infrastructure Construction

Drones Facilitate Infrastructure Construction

HANGZHOU, CHINA - OCTOBER 22, 2025 - Construction workers operate four heavy-duty drones to lift tower materials at the site of the Gansu - Zhejiang 。タ 800 kV HVDC transmission line project in Hangzhou, Zhejiang Province, China on October 22, 2025.

  •  
Drones Facilitate Infrastructure Construction

Drones Facilitate Infrastructure Construction

HANGZHOU, CHINA - OCTOBER 22, 2025 - Construction workers operate four heavy-duty drones to lift tower materials at the site of the Gansu - Zhejiang 。タ 800 kV HVDC transmission line project in Hangzhou, Zhejiang Province, China on October 22, 2025.

  •  
Drones Facilitate Infrastructure Construction

Drones Facilitate Infrastructure Construction

HANGZHOU, CHINA - OCTOBER 22, 2025 - Construction workers operate four heavy-duty drones to lift tower materials at the site of the Gansu - Zhejiang 。タ 800 kV HVDC transmission line project in Hangzhou, Zhejiang Province, China on October 22, 2025.

  •  
Drones Facilitate Infrastructure Construction

Drones Facilitate Infrastructure Construction

HANGZHOU, CHINA - OCTOBER 22, 2025 - Construction workers operate four heavy-duty drones to lift tower materials at the site of the Gansu - Zhejiang 。タ 800 kV HVDC transmission line project in Hangzhou, Zhejiang Province, China on October 22, 2025.

  •  
Drones Facilitate Infrastructure Construction

Drones Facilitate Infrastructure Construction

HANGZHOU, CHINA - OCTOBER 22, 2025 - Construction workers operate four heavy-duty drones to lift tower materials at the site of the Gansu - Zhejiang 。タ 800 kV HVDC transmission line project in Hangzhou, Zhejiang Province, China on October 22, 2025.

  •  
Drones Facilitate Infrastructure Construction

Drones Facilitate Infrastructure Construction

HANGZHOU, CHINA - OCTOBER 22, 2025 - Construction workers operate four heavy-duty drones to lift tower materials at the site of the Gansu - Zhejiang 。タ 800 kV HVDC transmission line project in Hangzhou, Zhejiang Province, China on October 22, 2025.

  •  
Drones Facilitate Infrastructure Construction

Drones Facilitate Infrastructure Construction

HANGZHOU, CHINA - OCTOBER 22, 2025 - Construction workers operate four heavy-duty drones to lift tower materials at the site of the Gansu - Zhejiang 。タ 800 kV HVDC transmission line project in Hangzhou, Zhejiang Province, China on October 22, 2025.

  •  
Drones Facilitate Infrastructure Construction

Drones Facilitate Infrastructure Construction

HANGZHOU, CHINA - OCTOBER 22, 2025 - Construction workers operate four heavy-duty drones to lift tower materials at the site of the Gansu - Zhejiang 。タ 800 kV HVDC transmission line project in Hangzhou, Zhejiang Province, China on October 22, 2025.

  •  
Drones Facilitate Infrastructure Construction

Drones Facilitate Infrastructure Construction

HANGZHOU, CHINA - OCTOBER 22, 2025 - Construction workers operate four heavy-duty drones to lift tower materials at the site of the Gansu - Zhejiang 。タ 800 kV HVDC transmission line project in Hangzhou, Zhejiang Province, China on October 22, 2025.

  •  
Drones Facilitate Infrastructure Construction

Drones Facilitate Infrastructure Construction

HANGZHOU, CHINA - OCTOBER 22, 2025 - Construction workers operate four heavy-duty drones to lift tower materials at the site of the Gansu - Zhejiang 。タ 800 kV HVDC transmission line project in Hangzhou, Zhejiang Province, China on October 22, 2025.

  •  
Infrastructure Construction in Nanjing

Infrastructure Construction in Nanjing

The construction site of Nanjing North Station is lined with tower cranes in Nanjing, Jiangsu Province, China on September 17, 2025.

  •  
Infrastructure Construction in Nanjing

Infrastructure Construction in Nanjing

The construction site of Nanjing North Station is lined with tower cranes in Nanjing, Jiangsu Province, China on September 17, 2025.

  •  
Infrastructure Construction in Nanjing

Infrastructure Construction in Nanjing

The construction site of Nanjing North Station is lined with tower cranes in Nanjing, Jiangsu Province, China on September 17, 2025.

  •  
Infrastructure Construction in Nanjing

Infrastructure Construction in Nanjing

The construction site of Nanjing North Station is lined with tower cranes in Nanjing, Jiangsu Province, China on September 17, 2025.

  •  
Infrastructure Construction in Nanjing

Infrastructure Construction in Nanjing

The construction site of Nanjing North Station is lined with tower cranes in Nanjing, Jiangsu Province, China on September 17, 2025.

  •  
Infrastructure Construction in Nanjing

Infrastructure Construction in Nanjing

The construction site of Nanjing North Station is lined with tower cranes in Nanjing, Jiangsu Province, China on September 17, 2025.

  •  
Infrastructure Construction in Nanjing

Infrastructure Construction in Nanjing

The construction site of Nanjing North Station is lined with tower cranes in Nanjing, Jiangsu Province, China on September 17, 2025.

  •  
Infrastructure Construction in Nanjing

Infrastructure Construction in Nanjing

The construction site of Nanjing North Station is lined with tower cranes in Nanjing, Jiangsu Province, China on September 17, 2025.

  • Main
  • Top
  • Editorial
  • Creative
  • About Us
  • About ILG
  • Terms of use
  • Company
  • BEHIND
  • Price List
  • Single Plan
  • Monthly Plan
  • Services
  • Shooting
  • Rights Clearance
  • Support
  • FAQ
  • How To Buy
  • Contact Us
  • Become a Partner

© KYODO NEWS IMAGES INC

All Rights Reserved.

  • Editorial
  • Olympics
  • News
  • Sports
  • Japan
  • Tech
  • Royal
  • Disaster
  • NorthKorea
  • Old Japan
  • SNS
  • Creative
  • Food
  • Japan
  • Landscape
  • Animal
  • Popular
  • #Ukraine
  • #Thailand
  • #coronavirus
  • #N. Korea
  • #China
  • #Russia
  • #Ukraine
  • #Thailand
  • #coronavirus
  • #N. Korea
  • #China
  • #Russia
  • Food
  • Japan
  • Landscape
  • Animal
  • Olympics
  • News
  • Sports
  • Japan
  • Tech
  • Royal
  • Disaster
  • NorthKorea
  • Old Japan
  • SNS