•  
Arles

Arles

FRANCE. BOUCHES-DU-RHONE (13). ARLES. MAJA HOFFMANN'S FONDATION LUMA. AT THE HEART OF THE PARC DES ATELIERS, AN 11-HECTARE CAMPUS DEDICATED TO THE ARTS DESIGNED BY ARCHITECT FRANK GEHRY. Photo by Antoine Lorgnier/Only France/ABACAPRESS.COM

  •  
Arles

Arles

FRANCE. BOUCHES-DU-RHONE (13). ARLES. MAJA HOFFMANN'S FONDATION LUMA. AT THE HEART OF THE PARC DES ATELIERS, AN 11-HECTARE CAMPUS DEDICATED TO THE ARTS DESIGNED BY ARCHITECT FRANK GEHRY. Photo by Christophe Lepetit/Only France/ABACAPRESS.COM

  •  
Tähtvere bike park

Tähtvere bike park

06.11.2025, Tartu. Official opening of bike park, offering riding pleasure to both the youngest riders and professional athletes. There are flow paths, rock fields, technical sections, jumps and an educational trail for children. Tähtvere bike park covers one hectare and the main lane is 600 meters long. Photo: Kristjan Teedema/Tartu Postimees

  •  
Tähtvere bike park

Tähtvere bike park

06.11.2025, Tartu. Official opening of bike park, offering riding pleasure to both the youngest riders and professional athletes. There are flow paths, rock fields, technical sections, jumps and an educational trail for children. Tähtvere bike park covers one hectare and the main lane is 600 meters long. Photo: Kristjan Teedema/Tartu Postimees

  •  
Tähtvere bike park

Tähtvere bike park

06.11.2025, Tartu. Official opening of bike park, offering riding pleasure to both the youngest riders and professional athletes. There are flow paths, rock fields, technical sections, jumps and an educational trail for children. Tähtvere bike park covers one hectare and the main lane is 600 meters long. Photo: Kristjan Teedema/Tartu Postimees

  •  
Tähtvere bike park

Tähtvere bike park

06.11.2025, Tartu. Official opening of bike park, offering riding pleasure to both the youngest riders and professional athletes. There are flow paths, rock fields, technical sections, jumps and an educational trail for children. Tähtvere bike park covers one hectare and the main lane is 600 meters long. Photo: Kristjan Teedema/Tartu Postimees

  •  
Tähtvere bike park

Tähtvere bike park

06.11.2025, Tartu. Official opening of bike park, offering riding pleasure to both the youngest riders and professional athletes. There are flow paths, rock fields, technical sections, jumps and an educational trail for children. Tähtvere bike park covers one hectare and the main lane is 600 meters long. Photo: Kristjan Teedema/Tartu Postimees

  •  
Tähtvere bike park

Tähtvere bike park

06.11.2025, Tartu. Official opening of bike park, offering riding pleasure to both the youngest riders and professional athletes. There are flow paths, rock fields, technical sections, jumps and an educational trail for children. Tähtvere bike park covers one hectare and the main lane is 600 meters long. Photo: Kristjan Teedema/Tartu Postimees

  •  
Tähtvere bike park

Tähtvere bike park

06.11.2025, Tartu. Official opening of bike park, offering riding pleasure to both the youngest riders and professional athletes. There are flow paths, rock fields, technical sections, jumps and an educational trail for children. Tähtvere bike park covers one hectare and the main lane is 600 meters long. Photo: Kristjan Teedema/Tartu Postimees

  •  
Tähtvere bike park

Tähtvere bike park

06.11.2025, Tartu. Official opening of bike park, offering riding pleasure to both the youngest riders and professional athletes. There are flow paths, rock fields, technical sections, jumps and an educational trail for children. Tähtvere bike park covers one hectare and the main lane is 600 meters long. Photo: Kristjan Teedema/Tartu Postimees

  •  
Site of arson attack in ethnic Korean district in western Japan

Site of arson attack in ethnic Korean district in western Japan

File photo taken on Aug. 31, 2021, shows some of the buildings burned down in an arson attack the previous day that damaged or destroyed seven buildings in Utoro, a 2-hectare ethnic Korean district in Uji, Kyoto Prefecture in western Japan. The attack was motivated by prejudice against Korean residents.

  •  
Site of arson attack in ethnic Korean district in western Japan

Site of arson attack in ethnic Korean district in western Japan

File photo taken on Aug. 31, 2021, shows some of the buildings burned down in an arson attack the previous day that damaged or destroyed seven buildings in Utoro, a 2-hectare ethnic Korean district in Uji, Kyoto Prefecture in western Japan. The attack was motivated by prejudice against Korean residents.

  •  
Arles

Arles

FRANCE. BOUCHES-DU-RHONE (13). ARLES. MAJA HOFFMANN'S FONDATION LUMA. AT THE HEART OF THE PARC DES ATELIERS, AN 11-HECTARE CAMPUS DEDICATED TO THE ARTS DESIGNED BY ARCHITECT FRANK GEHRY. Photo by Antoine Lorgnier/Only France/ABACAPRESS.COM

  •  
Arles

Arles

FRANCE. BOUCHES-DU-RHONE (13). ARLES. AERIAL VIEW OF MAJA HOFFMANN'S FONDATION LUMA IN THE HEART OF THE PARC DES ATELIERS, AN 11-HECTARE CAMPUS DEDICATED TO THE ARTS DESIGNED BY ARCHITECT FRANK GEHRY. Photo by Robert Palomba/Only France/ABACAPRESS.COM

  •  
Arles

Arles

FRANCE. BOUCHES-DU-RHONE (13). ARLES. MAJA HOFFMANN'S FONDATION LUMA. AT THE HEART OF THE PARC DES ATELIERS, AN 11-HECTARE CAMPUS DEDICATED TO THE ARTS DESIGNED BY ARCHITECT FRANK GEHRY. Photo by Antoine Lorgnier/Only France/ABACAPRESS.COM

  •  
Arles

Arles

FRANCE. BOUCHES-DU-RHONE (13). ARLES. MAJA HOFFMANN'S FONDATION LUMA. AT THE HEART OF THE PARC DES ATELIERS, AN 11-HECTARE CAMPUS DEDICATED TO THE ARTS DESIGNED BY ARCHITECT FRANK GEHRY. Photo by Christophe Lepetit/Only France/ABACAPRESS.COM

  •  
Illustration - Aerial View of France

Illustration - Aerial View of France

FRANCE - NORMANDY - CALVADOS (14) - COLLEVILLE SUR MER: SITE 3: AMERICAN CEMETERY OF COLLEVILLE SUR MER. OFFICIALLY INAUGURATED IN 1956, THIS 70 HECTARE NECROPOLIS IS LOCATED ON THE HEIGHTS OVERLOOKING OMAHA BEACH. IT WAS DESIGNED BY HARBESON, HOUGH, LIVINGSTON & LARSON AND THE SPACE WAS ARRANGED BY LANDSCAPE ARCHITECT MARKLEY STEVENSON WHO ENSURED THAT, FROM ANY ANGLE, A ROW OF CROSSES COULD BE SEEN. AT THE ENTRANCE TO THE CEMETERY, A BRONZE STATUE 7 METERS HIGH, INSIDE THE SEMI-CIRCLE FORMED BY THE COLONNADE OF THE MEMORIAL, FACES THE SQUARES OF THE TOMBS. IT SYMBOLIZES THE SPIRIT OF AMERICAN YOUTH RISING FROM THE WAVES. THIS STATUE IS SURROUNDED BY PEBBLES SYMBOLIZING THE DIFFICULTY OF TANKS CROSSING THE BEACH. THE WHITE MARBLE STELES ARE IN THE SHAPE OF A LATIN CROSS OR IN THE SHAPE OF THE STAR OF DAVID FOR SOLDIERS OF THE JEWISH FAITH. THE BODIES OF 9,388 PEOPLE ARE BURIED IN THE CEMETERY, INCLUDING 307 UNKNOWN PEOPLE AND FOUR WOMEN. THESE PEOPLE MAINLY DIED ON THE DAY OF THE LANDING OR IN THE FOLLOWING

  •  
Evacuation order lifted in Fukushima village

Evacuation order lifted in Fukushima village

A police vehicle patrols after an evacuation order is lifted in a nonresidential area in the village of Katsurao near the crippled Fukushima Daiichi nuclear power plant on March 31, 2025. The central government took the step in a 26-hectare area, including a wind power generation site in the village, on the condition that it be used only for business purposes.

  •  
Evacuation order lifted in Fukushima village

Evacuation order lifted in Fukushima village

An evacuation order is lifted in a nonresidential area in the village of Katsurao near the crippled Fukushima Daiichi nuclear power plant on March 31, 2025. The central government took the step in a 26-hectare area, including a wind power generation site in the village, on the condition that it be used only for business purposes.

  •  
Demolition of Nokia Industrial Site Begins - Essonne

Demolition of Nokia Industrial Site Begins - Essonne

Data 4, a data center campus developer, has begun demolition of the Nokia industrial site, originally created by the French company Alcatel, in Nozay, Essonne, France, on March 13, 2025. The Data4 Group, a major French player in data center operation and investment in Europe, announced the creation of a new data center campus in Nozay, in the Essonne region of France, on the former Nokia site. This project, which will represent an investment of around €1 billion by 2030, aims to revitalise the 22-hectare industrial and office site. Photo by Jean Pierre Nguyen Van Hai Barbier/ABACAPRESS.COM

  •  
Demolition of Nokia Industrial Site Begins - Essonne

Demolition of Nokia Industrial Site Begins - Essonne

Data 4, a data center campus developer, has begun demolition of the Nokia industrial site, originally created by the French company Alcatel, in Nozay, Essonne, France, on March 13, 2025. The Data4 Group, a major French player in data center operation and investment in Europe, announced the creation of a new data center campus in Nozay, in the Essonne region of France, on the former Nokia site. This project, which will represent an investment of around €1 billion by 2030, aims to revitalise the 22-hectare industrial and office site. Photo by Jean Pierre Nguyen Van Hai Barbier/ABACAPRESS.COM

  •  
Demolition of Nokia Industrial Site Begins - Essonne

Demolition of Nokia Industrial Site Begins - Essonne

Data 4, a data center campus developer, has begun demolition of the Nokia industrial site, originally created by the French company Alcatel, in Nozay, Essonne, France, on March 13, 2025. The Data4 Group, a major French player in data center operation and investment in Europe, announced the creation of a new data center campus in Nozay, in the Essonne region of France, on the former Nokia site. This project, which will represent an investment of around €1 billion by 2030, aims to revitalise the 22-hectare industrial and office site. Photo by Jean Pierre Nguyen Van Hai Barbier/ABACAPRESS.COM

  •  
Demolition of Nokia Industrial Site Begins - Essonne

Demolition of Nokia Industrial Site Begins - Essonne

Data 4, a data center campus developer, has begun demolition of the Nokia industrial site, originally created by the French company Alcatel, in Nozay, Essonne, France, on March 13, 2025. The Data4 Group, a major French player in data center operation and investment in Europe, announced the creation of a new data center campus in Nozay, in the Essonne region of France, on the former Nokia site. This project, which will represent an investment of around €1 billion by 2030, aims to revitalise the 22-hectare industrial and office site. Photo by Jean Pierre Nguyen Van Hai Barbier/ABACAPRESS.COM

  •  
Demolition of Nokia Industrial Site Begins - Essonne

Demolition of Nokia Industrial Site Begins - Essonne

Data 4, a data center campus developer, has begun demolition of the Nokia industrial site, originally created by the French company Alcatel, in Nozay, Essonne, France, on March 13, 2025. The Data4 Group, a major French player in data center operation and investment in Europe, announced the creation of a new data center campus in Nozay, in the Essonne region of France, on the former Nokia site. This project, which will represent an investment of around €1 billion by 2030, aims to revitalise the 22-hectare industrial and office site. Photo by Jean Pierre Nguyen Van Hai Barbier/ABACAPRESS.COM

  •  
Demolition of Nokia Industrial Site Begins - Essonne

Demolition of Nokia Industrial Site Begins - Essonne

Data 4, a data center campus developer, has begun demolition of the Nokia industrial site, originally created by the French company Alcatel, in Nozay, Essonne, France, on March 13, 2025. The Data4 Group, a major French player in data center operation and investment in Europe, announced the creation of a new data center campus in Nozay, in the Essonne region of France, on the former Nokia site. This project, which will represent an investment of around €1 billion by 2030, aims to revitalise the 22-hectare industrial and office site. Photo by Jean Pierre Nguyen Van Hai Barbier/ABACAPRESS.COM

  •  
Demolition of Nokia Industrial Site Begins - Essonne

Demolition of Nokia Industrial Site Begins - Essonne

Data 4, a data center campus developer, has begun demolition of the Nokia industrial site, originally created by the French company Alcatel, in Nozay, Essonne, France, on March 13, 2025. The Data4 Group, a major French player in data center operation and investment in Europe, announced the creation of a new data center campus in Nozay, in the Essonne region of France, on the former Nokia site. This project, which will represent an investment of around €1 billion by 2030, aims to revitalise the 22-hectare industrial and office site. Photo by Jean Pierre Nguyen Van Hai Barbier/ABACAPRESS.COM

  •  
Demolition of Nokia Industrial Site Begins - Essonne

Demolition of Nokia Industrial Site Begins - Essonne

Data 4, a data center campus developer, has begun demolition of the Nokia industrial site, originally created by the French company Alcatel, in Nozay, Essonne, France, on March 13, 2025. The Data4 Group, a major French player in data center operation and investment in Europe, announced the creation of a new data center campus in Nozay, in the Essonne region of France, on the former Nokia site. This project, which will represent an investment of around €1 billion by 2030, aims to revitalise the 22-hectare industrial and office site. Photo by Jean Pierre Nguyen Van Hai Barbier/ABACAPRESS.COM

  •  
Demolition of Nokia Industrial Site Begins - Essonne

Demolition of Nokia Industrial Site Begins - Essonne

Data 4, a data center campus developer, has begun demolition of the Nokia industrial site, originally created by the French company Alcatel, in Nozay, Essonne, France, on March 13, 2025. The Data4 Group, a major French player in data center operation and investment in Europe, announced the creation of a new data center campus in Nozay, in the Essonne region of France, on the former Nokia site. This project, which will represent an investment of around €1 billion by 2030, aims to revitalise the 22-hectare industrial and office site. Photo by Jean Pierre Nguyen Van Hai Barbier/ABACAPRESS.COM

  •  
Demolition of Nokia Industrial Site Begins - Essonne

Demolition of Nokia Industrial Site Begins - Essonne

Data 4, a data center campus developer, has begun demolition of the Nokia industrial site, originally created by the French company Alcatel, in Nozay, Essonne, France, on March 13, 2025. The Data4 Group, a major French player in data center operation and investment in Europe, announced the creation of a new data center campus in Nozay, in the Essonne region of France, on the former Nokia site. This project, which will represent an investment of around €1 billion by 2030, aims to revitalise the 22-hectare industrial and office site. Photo by Jean Pierre Nguyen Van Hai Barbier/ABACAPRESS.COM

  •  
Demolition of Nokia Industrial Site Begins - Essonne

Demolition of Nokia Industrial Site Begins - Essonne

Data 4, a data center campus developer, has begun demolition of the Nokia industrial site, originally created by the French company Alcatel, in Nozay, Essonne, France, on March 13, 2025. The Data4 Group, a major French player in data center operation and investment in Europe, announced the creation of a new data center campus in Nozay, in the Essonne region of France, on the former Nokia site. This project, which will represent an investment of around €1 billion by 2030, aims to revitalise the 22-hectare industrial and office site. Photo by Jean Pierre Nguyen Van Hai Barbier/ABACAPRESS.COM

  •  
Data 4 has begun demolition of the Nokia industrial site in Nozay - Essonne

Data 4 has begun demolition of the Nokia industrial site in Nozay - Essonne

Data 4, a data center campus developer, has begun demolition of the Nokia industrial site, originally created by the French company Alcatel, in Nozay, Essonne, France, on March 12, 2025. The Data4 Group, a major French player in data center operation and investment in Europe, announced the creation of a new data center campus in Nozay, in the Essonne region of France, on the former Nokia site. This project, which will represent an investment of around €1 billion by 2030, aims to revitalise the 22-hectare industrial and office site. Photo by Jean Pierre Nguyen Van Hai Barbier/ABACAPRESS.COM

  •  
Data 4 has begun demolition of the Nokia industrial site in Nozay - Essonne

Data 4 has begun demolition of the Nokia industrial site in Nozay - Essonne

Data 4, a data center campus developer, has begun demolition of the Nokia industrial site, originally created by the French company Alcatel, in Nozay, Essonne, France, on March 12, 2025. The Data4 Group, a major French player in data center operation and investment in Europe, announced the creation of a new data center campus in Nozay, in the Essonne region of France, on the former Nokia site. This project, which will represent an investment of around €1 billion by 2030, aims to revitalise the 22-hectare industrial and office site. Photo by Jean Pierre Nguyen Van Hai Barbier/ABACAPRESS.COM

  •  
Data 4 has begun demolition of the Nokia industrial site in Nozay - Essonne

Data 4 has begun demolition of the Nokia industrial site in Nozay - Essonne

Data 4, a data center campus developer, has begun demolition of the Nokia industrial site, originally created by the French company Alcatel, in Nozay, Essonne, France, on March 12, 2025. The Data4 Group, a major French player in data center operation and investment in Europe, announced the creation of a new data center campus in Nozay, in the Essonne region of France, on the former Nokia site. This project, which will represent an investment of around €1 billion by 2030, aims to revitalise the 22-hectare industrial and office site. Photo by Jean Pierre Nguyen Van Hai Barbier/ABACAPRESS.COM

  •  
Data 4 has begun demolition of the Nokia industrial site in Nozay - Essonne

Data 4 has begun demolition of the Nokia industrial site in Nozay - Essonne

Data 4, a data center campus developer, has begun demolition of the Nokia industrial site, originally created by the French company Alcatel, in Nozay, Essonne, France, on March 12, 2025. The Data4 Group, a major French player in data center operation and investment in Europe, announced the creation of a new data center campus in Nozay, in the Essonne region of France, on the former Nokia site. This project, which will represent an investment of around €1 billion by 2030, aims to revitalise the 22-hectare industrial and office site. Photo by Jean Pierre Nguyen Van Hai Barbier/ABACAPRESS.COM

  •  
Data 4 has begun demolition of the Nokia industrial site in Nozay - Essonne

Data 4 has begun demolition of the Nokia industrial site in Nozay - Essonne

Data 4, a data center campus developer, has begun demolition of the Nokia industrial site, originally created by the French company Alcatel, in Nozay, Essonne, France, on March 12, 2025. The Data4 Group, a major French player in data center operation and investment in Europe, announced the creation of a new data center campus in Nozay, in the Essonne region of France, on the former Nokia site. This project, which will represent an investment of around €1 billion by 2030, aims to revitalise the 22-hectare industrial and office site. Photo by Jean Pierre Nguyen Van Hai Barbier/ABACAPRESS.COM

  •  
Data 4 has begun demolition of the Nokia industrial site in Nozay - Essonne

Data 4 has begun demolition of the Nokia industrial site in Nozay - Essonne

Data 4, a data center campus developer, has begun demolition of the Nokia industrial site, originally created by the French company Alcatel, in Nozay, Essonne, France, on March 12, 2025. The Data4 Group, a major French player in data center operation and investment in Europe, announced the creation of a new data center campus in Nozay, in the Essonne region of France, on the former Nokia site. This project, which will represent an investment of around €1 billion by 2030, aims to revitalise the 22-hectare industrial and office site. Photo by Jean Pierre Nguyen Van Hai Barbier/ABACAPRESS.COM

  •  
Data 4 has begun demolition of the Nokia industrial site in Nozay - Essonne

Data 4 has begun demolition of the Nokia industrial site in Nozay - Essonne

Data 4, a data center campus developer, has begun demolition of the Nokia industrial site, originally created by the French company Alcatel, in Nozay, Essonne, France, on March 12, 2025. The Data4 Group, a major French player in data center operation and investment in Europe, announced the creation of a new data center campus in Nozay, in the Essonne region of France, on the former Nokia site. This project, which will represent an investment of around €1 billion by 2030, aims to revitalise the 22-hectare industrial and office site. Photo by Jean Pierre Nguyen Van Hai Barbier/ABACAPRESS.COM

  •  
Data 4 has begun demolition of the Nokia industrial site in Nozay - Essonne

Data 4 has begun demolition of the Nokia industrial site in Nozay - Essonne

Data 4, a data center campus developer, has begun demolition of the Nokia industrial site, originally created by the French company Alcatel, in Nozay, Essonne, France, on March 12, 2025. The Data4 Group, a major French player in data center operation and investment in Europe, announced the creation of a new data center campus in Nozay, in the Essonne region of France, on the former Nokia site. This project, which will represent an investment of around €1 billion by 2030, aims to revitalise the 22-hectare industrial and office site. Photo by Jean Pierre Nguyen Van Hai Barbier/ABACAPRESS.COM

  •  
Data 4 has begun demolition of the Nokia industrial site in Nozay - Essonne

Data 4 has begun demolition of the Nokia industrial site in Nozay - Essonne

Data 4, a data center campus developer, has begun demolition of the Nokia industrial site, originally created by the French company Alcatel, in Nozay, Essonne, France, on March 12, 2025. The Data4 Group, a major French player in data center operation and investment in Europe, announced the creation of a new data center campus in Nozay, in the Essonne region of France, on the former Nokia site. This project, which will represent an investment of around €1 billion by 2030, aims to revitalise the 22-hectare industrial and office site. Photo by Jean Pierre Nguyen Van Hai Barbier/ABACAPRESS.COM

  •  
Data 4 has begun demolition of the Nokia industrial site in Nozay - Essonne

Data 4 has begun demolition of the Nokia industrial site in Nozay - Essonne

Data 4, a data center campus developer, has begun demolition of the Nokia industrial site, originally created by the French company Alcatel, in Nozay, Essonne, France, on March 12, 2025. The Data4 Group, a major French player in data center operation and investment in Europe, announced the creation of a new data center campus in Nozay, in the Essonne region of France, on the former Nokia site. This project, which will represent an investment of around €1 billion by 2030, aims to revitalise the 22-hectare industrial and office site. Photo by Jean Pierre Nguyen Van Hai Barbier/ABACAPRESS.COM

  •  
Data 4 has begun demolition of the Nokia industrial site in Nozay - Essonne

Data 4 has begun demolition of the Nokia industrial site in Nozay - Essonne

Data 4, a data center campus developer, has begun demolition of the Nokia industrial site, originally created by the French company Alcatel, in Nozay, Essonne, France, on March 12, 2025. The Data4 Group, a major French player in data center operation and investment in Europe, announced the creation of a new data center campus in Nozay, in the Essonne region of France, on the former Nokia site. This project, which will represent an investment of around €1 billion by 2030, aims to revitalise the 22-hectare industrial and office site. Photo by Jean Pierre Nguyen Van Hai Barbier/ABACAPRESS.COM

  •  
Sun-dried Tomatoes Field - Egypt

Sun-dried Tomatoes Field - Egypt

A farmer collects dried tomatoes at a village in Luxor, Egypt, on Jan. 9, 2025. According to data from Egypt's Ministry of Agriculture and Land Reclamation, the country's exports of dried tomatoes exceed 100 million dollars annually. The data also revealed that one hectare yields 35 tons of dried tomatoes, which are sold for 350,000 Egyptian pounds. Photo by Ahmed Gomaa/Xinhua/ABACAPRESS.COM

  •  
Sun-dried Tomatoes Field - Egypt

Sun-dried Tomatoes Field - Egypt

Farmers collect dried tomatoes at a village in Luxor, Egypt, on Jan. 9, 2025. According to data from Egypt's Ministry of Agriculture and Land Reclamation, the country's exports of dried tomatoes exceed 100 million dollars annually. The data also revealed that one hectare yields 35 tons of dried tomatoes, which are sold for 350,000 Egyptian pounds. Photo by Ahmed Gomaa/Xinhua/ABACAPRESS.COM

  •  
Sun-dried Tomatoes Field - Egypt

Sun-dried Tomatoes Field - Egypt

Sliced tomatoes are dried in the sun at a village in Luxor, Egypt, on Jan. 9, 2025. According to data from Egypt's Ministry of Agriculture and Land Reclamation, the country's exports of dried tomatoes exceed 100 million dollars annually. The data also revealed that one hectare yields 35 tons of dried tomatoes, which are sold for 350,000 Egyptian pounds. Photo by Ahmed Gomaa/Xinhua/ABACAPRESS.COM

  •  
Sun-dried Tomatoes Field - Egypt

Sun-dried Tomatoes Field - Egypt

A farmer sprinkles salt on sliced tomatoes to be dried at a village in Luxor, Egypt, on Jan. 9, 2025. According to data from Egypt's Ministry of Agriculture and Land Reclamation, the country's exports of dried tomatoes exceed 100 million dollars annually. The data also revealed that one hectare yields 35 tons of dried tomatoes, which are sold for 350,000 Egyptian pounds. Photo by Ahmed Gomaa/Xinhua/ABACAPRESS.COM

  •  
Sun-dried Tomatoes Field - Egypt

Sun-dried Tomatoes Field - Egypt

Sliced tomatoes are dried in the sun at a village in Luxor, Egypt, on Jan. 9, 2025. According to data from Egypt's Ministry of Agriculture and Land Reclamation, the country's exports of dried tomatoes exceed 100 million dollars annually. The data also revealed that one hectare yields 35 tons of dried tomatoes, which are sold for 350,000 Egyptian pounds. Photo by Ahmed Gomaa/Xinhua/ABACAPRESS.COM

  •  
40,000 kochia carpet park

40,000 kochia carpet park

Photo taken on Oct. 19, 2024, shows 40,000 autumn kochia forming a red carpet at the 215-hectare Hitachi Seaside Park, a popular tourist destination in Hitachinaka, Ibaraki Prefecture, eastern Japan.

  •  
40,000 kochia carpet park

40,000 kochia carpet park

Photo taken on Oct. 19, 2024, shows 40,000 autumn kochia forming a red carpet at the 215-hectare Hitachi Seaside Park, a popular tourist destination in Hitachinaka, Ibaraki Prefecture, eastern Japan.

  •  
40,000 kochia carpet park

40,000 kochia carpet park

Photo taken on Oct. 19, 2024, shows 40,000 autumn kochia forming a red carpet at the 215-hectare Hitachi Seaside Park, a popular tourist destination in Hitachinaka, Ibaraki Prefecture, eastern Japan.

  •  
Tigers settling in to new Tallinn Zoo habitat

Tigers settling in to new Tallinn Zoo habitat

16.07.2024, Tallinn. Siberian tiger Danuta, who was recently relocated to Tallinn Zoo, I settling into her newly created habitat. The new 2.5-hectare "Tiger Valley" development features large and diverse living conditions plus pathways connecting various habitats. Photo: Oliver Kaur / Postimees.

  • Main
  • Top
  • Editorial
  • Creative
  • About Us
  • About ILG
  • Terms of use
  • Company
  • BEHIND
  • Price List
  • Single Plan
  • Monthly Plan
  • Services
  • Shooting
  • Rights Clearance
  • Support
  • FAQ
  • How To Buy
  • Contact Us
  • Become a Partner

© KYODO NEWS IMAGES INC

All Rights Reserved.

  • Editorial
  • Olympics
  • News
  • Sports
  • Japan
  • Tech
  • Royal
  • Disaster
  • NorthKorea
  • Old Japan
  • SNS
  • Creative
  • Food
  • Japan
  • Landscape
  • Animal
  • Popular
  • #Ukraine
  • #Russia
  • #coronavirus
  • #N. Korea
  • #Thailand
  • #China
  • #Ukraine
  • #Russia
  • #coronavirus
  • #N. Korea
  • #Thailand
  • #China
  • Food
  • Japan
  • Landscape
  • Animal
  • Olympics
  • News
  • Sports
  • Japan
  • Tech
  • Royal
  • Disaster
  • NorthKorea
  • Old Japan
  • SNS