•  
Illustration - Logos - World Nuclear Exhibition 2025

Illustration - Logos - World Nuclear Exhibition 2025

Illustration of the Framatome logo, International leader in nuclear energy, nuclear boiler manufacturer, supplier of equipment, services, and fuel for high levels of safety and performance, at the World Nuclear Exhibition at the Villepinte Exhibition Center on November 4, 2025. Photo by Tomas Stevens/ABACAPRESS.COM

  •  
Fukushima soil used for METI flower bed

Fukushima soil used for METI flower bed

Soil generated from decontamination work near the crippled Fukushima Daiichi nuclear power plant is moved into a flower bed at the headquarters of the Japanese Ministry of Economy, Trade and Industry in Tokyo on Sept. 14, 2025. The Japanese government is using the soil at various government facilities to ease public safety concerns.

  •  
Fukushima soil used for METI flower bed

Fukushima soil used for METI flower bed

Soil generated from decontamination work near the crippled Fukushima Daiichi nuclear power plant is moved into a flower bed at the headquarters of the Japanese Ministry of Economy, Trade and Industry in Tokyo on Sept. 14, 2025. The Japanese government is using the soil at various government facilities to ease public safety concerns.

  •  
Fukushima soil used for METI flower bed

Fukushima soil used for METI flower bed

Soil generated from decontamination work near the crippled Fukushima Daiichi nuclear power plant is moved into a flower bed at the headquarters of the Japanese Ministry of Economy, Trade and Industry in Tokyo on Sept. 14, 2025. The Japanese government is using the soil at various government facilities to ease public safety concerns.

  •  
Fukushima soil used for METI flower bed

Fukushima soil used for METI flower bed

Soil generated from decontamination work near the crippled Fukushima Daiichi nuclear power plant is moved into a flower bed at the headquarters of the Japanese Ministry of Economy, Trade and Industry in Tokyo on Sept. 14, 2025. The Japanese government is using the soil at various government facilities to ease public safety concerns.

  •  
The Reactor Building of Unit 4 of Haiyang Nuclear Power Plant Capped

The Reactor Building of Unit 4 of Haiyang Nuclear Power Plant Capped

YANTAI, CHINA - SEPTEMBER 6, 2025 - Large crane lifts the top head of the safety shell of Unit 4 nuclear island at Haiyang Nuclear Power Plant in Yantai, Shandong, China on September 6, 2025.

  •  
The Reactor Building of Unit 4 of Haiyang Nuclear Power Plant Capped

The Reactor Building of Unit 4 of Haiyang Nuclear Power Plant Capped

YANTAI, CHINA - SEPTEMBER 6, 2025 - Large crane lifts the top head of the safety shell of Unit 4 nuclear island at Haiyang Nuclear Power Plant in Yantai, Shandong, China on September 6, 2025.

  •  
The Reactor Building of Unit 4 of Haiyang Nuclear Power Plant Capped

The Reactor Building of Unit 4 of Haiyang Nuclear Power Plant Capped

YANTAI, CHINA - SEPTEMBER 6, 2025 - Large crane lifts the top head of the safety shell of Unit 4 nuclear island at Haiyang Nuclear Power Plant in Yantai, Shandong, China on September 6, 2025.

  •  
The Reactor Building of Unit 4 of Haiyang Nuclear Power Plant Capped

The Reactor Building of Unit 4 of Haiyang Nuclear Power Plant Capped

YANTAI, CHINA - SEPTEMBER 6, 2025 - Large crane lifts the top head of the safety shell of Unit 4 nuclear island at Haiyang Nuclear Power Plant in Yantai, Shandong, China on September 6, 2025.

  •  
The Reactor Building of Unit 4 of Haiyang Nuclear Power Plant Capped

The Reactor Building of Unit 4 of Haiyang Nuclear Power Plant Capped

YANTAI, CHINA - SEPTEMBER 6, 2025 - Large crane lifts the top head of the safety shell of Unit 4 nuclear island at Haiyang Nuclear Power Plant in Yantai, Shandong, China on September 6, 2025.

  •  
The Reactor Building of Unit 4 of Haiyang Nuclear Power Plant Capped

The Reactor Building of Unit 4 of Haiyang Nuclear Power Plant Capped

YANTAI, CHINA - SEPTEMBER 6, 2025 - Large crane lifts the top head of the safety shell of Unit 4 nuclear island at Haiyang Nuclear Power Plant in Yantai, Shandong, China on September 6, 2025.

  •  
The Reactor Building of Unit 4 of Haiyang Nuclear Power Plant Capped

The Reactor Building of Unit 4 of Haiyang Nuclear Power Plant Capped

YANTAI, CHINA - SEPTEMBER 6, 2025 - Large crane lifts the top head of the safety shell of Unit 4 nuclear island at Haiyang Nuclear Power Plant in Yantai, Shandong, China on September 6, 2025.

  •  
The Reactor Building of Unit 4 of Haiyang Nuclear Power Plant Capped

The Reactor Building of Unit 4 of Haiyang Nuclear Power Plant Capped

YANTAI, CHINA - SEPTEMBER 6, 2025 - Large crane lifts the top head of the safety shell of Unit 4 nuclear island at Haiyang Nuclear Power Plant in Yantai, Shandong, China on September 6, 2025.

  •  
Fukushima soil used for yard of PM office

Fukushima soil used for yard of PM office

Photo taken on July 22, 2025, shows the front yard of the prime minister's office in Tokyo, where soil from decontamination work near the crippled Fukushima Daiichi nuclear power plant has been placed. The government is utilizing the soil in an effort to ease public safety concerns.

  •  

[Breaking News]Fukushima soil moved to PM's yard in effort to allay safety fears

TOKYO, Japan, July 19 Kyodo - Soil collected in decontamination work near the crippled Fukushima Daiichi nuclear complex is delivered to central Tokyo on on July 19, 2025, to be spread in the front yard of the prime minister's office, as the government attempts to allay safety concerns about its use. (Kyodo)

  •  
Fukushima soil used for yard of PM office

Fukushima soil used for yard of PM office

Photo taken on July 22, 2025, shows the front yard of the prime minister's office in Tokyo, containing soil generated during decontamination work near the crippled Fukushima Daiichi nuclear power plant. The soil was moved recently from interim facilities to store such soil, set up in Fukushima plant co-hosts Okuma and Futaba towns in Fukushima Prefecture, northeastern Japan, with the government attempting to allay the public's safety concerns about the soil.

  •  
Fukushima soil used for yard of PM office

Fukushima soil used for yard of PM office

Photo taken on July 22, 2025, shows the front yard of the prime minister's office in Tokyo, containing soil generated during decontamination work near the crippled Fukushima Daiichi nuclear power plant. The soil was moved recently from interim facilities to store such soil, set up in Fukushima plant co-hosts Okuma and Futaba towns in Fukushima Prefecture, northeastern Japan, with the government attempting to allay the public's safety concerns about the soil.

  •  
Fukushima soil moved to PM's yard in effort to allay safety fears

Fukushima soil moved to PM's yard in effort to allay safety fears

Soil collected in decontamination work near the crippled Fukushima Daiichi nuclear complex is delivered to central Tokyo on on July 19, 2025, to be spread in the front yard of the prime minister's office, as the government attempts to allay safety concerns about its use.

  •  
Fukushima soil moved to PM's yard in effort to allay safety fears

Fukushima soil moved to PM's yard in effort to allay safety fears

Soil collected in decontamination work near the crippled Fukushima Daiichi nuclear complex is delivered to central Tokyo on July 19, 2025, to be spread in the front yard of the prime minister's office, as the government attempts to allay safety concerns about its use.

  •  
Fukushima soil moved to PM's yard in effort to allay safety fears

Fukushima soil moved to PM's yard in effort to allay safety fears

Soil collected in decontamination work near the crippled Fukushima Daiichi nuclear complex is delivered to central Tokyo on on July 19, 2025, to be spread in the front yard of the prime minister's office, as the government attempts to allay safety concerns about its use.

  •  
Fukushima soil moved to PM's yard in effort to allay safety fears

Fukushima soil moved to PM's yard in effort to allay safety fears

Soil collected in decontamination work near the crippled Fukushima Daiichi nuclear complex is delivered to central Tokyo on on July 19, 2025, to be spread in the front yard of the prime minister's office, as the government attempts to allay safety concerns about its use.

  •  
Illustration - Economy

Illustration - Economy

FRANCE. LORRAINE. MOSELLE (57) CATTENOM. TEN-YEARLY VISIT (97 DAYS) TO THE CATTENOM NUCLEAR POWER PLANT. A MECHANIC WEARING THE PERSONAL SAFETY EQUIPMENT REQUIRED TO ENTER THE MOST SENSITIVE PARTS OF THE REACTOR BUILDING. Photo by Stephane Compoint/Only France/ABACAPRESS.COM

  •  
Rice planting in Fukushima

Rice planting in Fukushima

Rice is planted in a paddy on May 23, 2025, in the Nagadoro area of Iitate in Fukushima Prefecture, which saw partial lifting in 2023 of the evacuation instruction imposed in the wake of the 2011 Fukushima Daiichi nuclear power plant disaster. If the planted rice clears safety tests for radioactive materials when harvested, the Nagadoro area would be able to ship rice to the market for the first time since the nuclear disaster.

  •  
Rice planting in Fukushima

Rice planting in Fukushima

Rice is planted in a paddy on May 23, 2025, in the Nagadoro area of Iitate in Fukushima Prefecture, which saw partial lifting in 2023 of the evacuation instruction imposed in the wake of the 2011 Fukushima Daiichi nuclear power plant disaster. If the planted rice clears safety tests for radioactive materials when harvested, the Nagadoro area would be able to ship rice to the market for the first time since the nuclear disaster.

  •  
Russian drone hits Chornobyl shelter

Russian drone hits Chornobyl shelter

KYIV REGION, UKRAINE - FEBRUARY 14, 2025 - The fragments of a Russian attack drone with an explosive warhead that hit the New Safe Confinement at the Chornobyl Nuclear Power Plant on Friday night, January 14, are arranged on the ground, Kyiv region, northern Ukraine. The structure put in place in 2016 protects the remains of Reactor 4 destroyed during the 1986 Chornobyl disaster. (Photo by Volodymyr Tarasov/Ukrinform)

  •  
Russian drone hits Chornobyl shelter

Russian drone hits Chornobyl shelter

KYIV REGION, UKRAINE - FEBRUARY 14, 2025 - The fragments of a Russian attack drone with an explosive warhead that hit the New Safe Confinement at the Chornobyl Nuclear Power Plant on Friday night, January 14, are arranged on the ground, Kyiv region, northern Ukraine. The structure put in place in 2016 protects the remains of Reactor 4 destroyed during the 1986 Chornobyl disaster. (Photo by Volodymyr Tarasov/Ukrinform)

  •  
Russian drone hits Chornobyl shelter

Russian drone hits Chornobyl shelter

KYIV REGION, UKRAINE - FEBRUARY 14, 2025 - The fragments of a Russian attack drone with an explosive warhead that hit the New Safe Confinement at the Chornobyl Nuclear Power Plant on Friday night, January 14, are arranged on the ground, Kyiv region, northern Ukraine. The structure put in place in 2016 protects the remains of Reactor 4 destroyed during the 1986 Chornobyl disaster. (Photo by Volodymyr Tarasov/Ukrinform)

  •  
Russian drone hits Chornobyl shelter

Russian drone hits Chornobyl shelter

KYIV REGION, UKRAINE - FEBRUARY 14, 2025 - A worker measures radiation levels on the sole of a mans boot outside the New Safe Confinement at the Chornobyl Nuclear Power Plant that was hit by a Russian attack drone with an explosive warhead on Friday night, January 14, Kyiv region, northern Ukraine. The structure put in place in 2016 protects the remains of Reactor 4 destroyed during the 1986 Chornobyl disaster. (Photo by Volodymyr Tarasov/Ukrinform)

  •  
Russian drone hits Chornobyl shelter

Russian drone hits Chornobyl shelter

KYIV REGION, UKRAINE - FEBRUARY 14, 2025 - The monument to those who protected the world from the nuclear disaster erected to commemorate the 20th anniversary of the accident is outside the New Safe Confinement at the Chornobyl Nuclear Power Plant that was hit by a Russian attack drone with an explosive warhead on Friday night, January 14, Kyiv region, northern Ukraine. The structure put in place in 2016 protects the remains of Reactor 4 destroyed during the 1986 Chornobyl disaster. (Photo by Volodymyr Tarasov/Ukrinform)

  •  
Russian drone hits Chornobyl shelter

Russian drone hits Chornobyl shelter

KYIV REGION, UKRAINE - FEBRUARY 14, 2025 - Rescuers look at the New Safe Confinement at the Chornobyl Nuclear Power Plant that was hit by a Russian attack drone with an explosive warhead on Friday night, January 14, Kyiv region, northern Ukraine. The structure put in place in 2016 protects the remains of Reactor 4 destroyed during the 1986 Chornobyl disaster. (Photo by Volodymyr Tarasov/Ukrinform)

  •  
Russian drone hits Chornobyl shelter

Russian drone hits Chornobyl shelter

KYIV REGION, UKRAINE - FEBRUARY 14, 2025 - The New Safe Confinement at the Chornobyl Nuclear Power Plant that was hit by a Russian attack drone with an explosive warhead on Friday night, January 14, protects the remains of Reactor 4 destroyed during the 1986 Chornobyl disaster, Kyiv region, northern Ukraine. (Photo by Volodymyr Tarasov/Ukrinform)

  •  
Russian drone hits Chornobyl shelter

Russian drone hits Chornobyl shelter

KYIV REGION, UKRAINE - FEBRUARY 14, 2025 - Men look at the fragments of a Russian attack drone with an explosive warhead that hit the New Safe Confinement at the Chornobyl Nuclear Power Plant on Friday night, January 14, Kyiv region, northern Ukraine. The structure put in place in 2016 protects the remains of Reactor 4 destroyed during the 1986 Chornobyl disaster. (Photo by Volodymyr Tarasov/Ukrinform)

  •  
Russian drone hits Chornobyl shelter

Russian drone hits Chornobyl shelter

KYIV REGION, UKRAINE - FEBRUARY 14, 2025 - A worker measures radiation levels on the sole of a mans boot outside the New Safe Confinement at the Chornobyl Nuclear Power Plant that was hit by a Russian attack drone with an explosive warhead on Friday night, January 14, Kyiv region, northern Ukraine. The structure put in place in 2016 protects the remains of Reactor 4 destroyed during the 1986 Chornobyl disaster. (Photo by Volodymyr Tarasov/Ukrinform)

  •  
Russian drone hits Chornobyl shelter

Russian drone hits Chornobyl shelter

KYIV REGION, UKRAINE - FEBRUARY 14, 2025 - Rescuers work at the place where a Russian attack drone with an explosive warhead hit the New Safe Confinement at the Chornobyl Nuclear Power Plant on Friday night, January 14, Kyiv region, northern Ukraine. The structure put in place in 2016 protects the remains of Reactor 4 destroyed during the 1986 Chornobyl disaster. (Photo by Volodymyr Tarasov/Ukrinform)

  •  
Russian drone hits Chornobyl shelter

Russian drone hits Chornobyl shelter

KYIV REGION, UKRAINE - FEBRUARY 14, 2025 - The fragments of a Russian attack drone with an explosive warhead that hit the New Safe Confinement at the Chornobyl Nuclear Power Plant on Friday night, January 14, are arranged on the ground, Kyiv region, northern Ukraine. The structure put in place in 2016 protects the remains of Reactor 4 destroyed during the 1986 Chornobyl disaster. (Photo by Volodymyr Tarasov/Ukrinform)

  •  
Russian drone hits Chornobyl shelter

Russian drone hits Chornobyl shelter

KYIV REGION, UKRAINE - FEBRUARY 14, 2025 - The fragments of a Russian attack drone with an explosive warhead that hit the New Safe Confinement at the Chornobyl Nuclear Power Plant on Friday night, January 14, are arranged on the ground, Kyiv region, northern Ukraine. The structure put in place in 2016 protects the remains of Reactor 4 destroyed during the 1986 Chornobyl disaster. (Photo by Volodymyr Tarasov/Ukrinform)

  •  
Russian drone hits Chornobyl shelter

Russian drone hits Chornobyl shelter

KYIV REGION, UKRAINE - FEBRUARY 14, 2025 - An ambulance is parked outside the New Safe Confinement at the Chornobyl Nuclear Power Plant that was hit by a Russian attack drone with an explosive warhead on Friday night, January 14, Kyiv region, northern Ukraine. The structure put in place in 2016 protects the remains of Reactor 4 destroyed during the 1986 Chornobyl disaster. (Photo by Volodymyr Tarasov/Ukrinform)

  •  
Russian drone hits Chornobyl shelter

Russian drone hits Chornobyl shelter

KYIV REGION, UKRAINE - FEBRUARY 14, 2025 - The New Safe Confinement at the Chornobyl Nuclear Power Plant that was hit by a Russian attack drone with an explosive warhead on Friday night, January 14, protects the remains of Reactor 4 destroyed during the 1986 Chornobyl disaster, Kyiv region, northern Ukraine. (Photo by Volodymyr Tarasov/Ukrinform)

  •  
Russian drone hits Chornobyl shelter

Russian drone hits Chornobyl shelter

KYIV REGION, UKRAINE - FEBRUARY 14, 2025 - A car of the emergency service is parked outside the New Safe Confinement at the Chornobyl Nuclear Power Plant that was hit by a Russian attack drone with an explosive warhead on Friday night, January 14, Kyiv region, northern Ukraine. The structure put in place in 2016 protects the remains of Reactor 4 destroyed during the 1986 Chornobyl disaster. (Photo by Volodymyr Tarasov/Ukrinform)

  •  
Russian drone hits Chornobyl shelter

Russian drone hits Chornobyl shelter

KYIV REGION, UKRAINE - FEBRUARY 14, 2025 - The New Safe Confinement at the Chornobyl Nuclear Power Plant that was hit by a Russian attack drone with an explosive warhead on Friday night, January 14, protects the remains of Reactor 4 destroyed during the 1986 Chornobyl disaster, Kyiv region, northern Ukraine. (Photo by Volodymyr Tarasov/Ukrinform)

  •  
Russian drone hits Chornobyl shelter

Russian drone hits Chornobyl shelter

KYIV REGION, UKRAINE - FEBRUARY 14, 2025 - Chief engineer at the Chornobyl NPP Oleksandr Tytarchuk (2nd L), head of the State Agency of Ukraine on Exclusion Zone Management, Hryhorii Ishchenko (C) and head of the State Emergency Service of Ukraine Andrii Danyk (2nd R) brief the press outside the New Safe Confinement at the Chornobyl Nuclear Power Plant that was hit by a Russian attack drone with an explosive warhead on Friday night, January 14, Kyiv region, northern Ukraine. The structure put in place in 2016 protects the remains of Reactor 4 destroyed during the 1986 Chornobyl disaster. (Photo by Volodymyr Tarasov/Ukrinform)

  •  
Russian drone hits Chornobyl shelter

Russian drone hits Chornobyl shelter

KYIV REGION, UKRAINE - FEBRUARY 14, 2025 - Rescuers work at the place where a Russian attack drone with an explosive warhead hit the New Safe Confinement at the Chornobyl Nuclear Power Plant on Friday night, January 14, Kyiv region, northern Ukraine. The structure put in place in 2016 protects the remains of Reactor 4 destroyed during the 1986 Chornobyl disaster. (Photo by Volodymyr Tarasov/Ukrinform)

  •  
Russian drone hits Chornobyl shelter

Russian drone hits Chornobyl shelter

KYIV REGION, UKRAINE - FEBRUARY 14, 2025 - Rescuers look at the New Safe Confinement at the Chornobyl Nuclear Power Plant that was hit by a Russian attack drone with an explosive warhead on Friday night, January 14, Kyiv region, northern Ukraine. The structure put in place in 2016 protects the remains of Reactor 4 destroyed during the 1986 Chornobyl disaster. (Photo by Volodymyr Tarasov/Ukrinform)

  •  
Iran President Visits Bushehr Nuclear Power Plant - Iran

Iran President Visits Bushehr Nuclear Power Plant - Iran

Iran’s President Masoud Pezeshkian, visiting The Bushehr Nuclear Power Plant different parts of the nuclear power plant which is being developed within three phases. The two operations Pezeshkian ordered to launch are related to phases 2 and 3, which include the installation of key equipment at the reactor building of the second unit to increase safety. Bushehr, Iran,  February 13, 2025. Photo by SalamPix/ABACAPRESS.COM

  •  
Iran President Visits Bushehr Nuclear Power Plant - Iran

Iran President Visits Bushehr Nuclear Power Plant - Iran

Iran’s President Masoud Pezeshkian, visiting The Bushehr Nuclear Power Plant different parts of the nuclear power plant which is being developed within three phases. The two operations Pezeshkian ordered to launch are related to phases 2 and 3, which include the installation of key equipment at the reactor building of the second unit to increase safety. Bushehr, Iran,  February 13, 2025. Photo by SalamPix/ABACAPRESS.COM

  •  
Iran President Visits Bushehr Nuclear Power Plant - Iran

Iran President Visits Bushehr Nuclear Power Plant - Iran

Iran’s President Masoud Pezeshkian, visiting The Bushehr Nuclear Power Plant different parts of the nuclear power plant which is being developed within three phases. The two operations Pezeshkian ordered to launch are related to phases 2 and 3, which include the installation of key equipment at the reactor building of the second unit to increase safety. Bushehr, Iran,  February 13, 2025. Photo by SalamPix/ABACAPRESS.COM

  •  
Iran President Visits Bushehr Nuclear Power Plant - Iran

Iran President Visits Bushehr Nuclear Power Plant - Iran

Iran’s President Masoud Pezeshkian, visiting The Bushehr Nuclear Power Plant different parts of the nuclear power plant which is being developed within three phases. The two operations Pezeshkian ordered to launch are related to phases 2 and 3, which include the installation of key equipment at the reactor building of the second unit to increase safety. Bushehr, Iran,  February 13, 2025. Photo by SalamPix/ABACAPRESS.COM

  •  
Iran President Visits Bushehr Nuclear Power Plant - Iran

Iran President Visits Bushehr Nuclear Power Plant - Iran

Iran’s President Masoud Pezeshkian, visiting The Bushehr Nuclear Power Plant different parts of the nuclear power plant which is being developed within three phases. The two operations Pezeshkian ordered to launch are related to phases 2 and 3, which include the installation of key equipment at the reactor building of the second unit to increase safety. Bushehr, Iran,  February 13, 2025. Photo by SalamPix/ABACAPRESS.COM

  •  
Iran President Visits Bushehr Nuclear Power Plant - Iran

Iran President Visits Bushehr Nuclear Power Plant - Iran

Iran’s President Masoud Pezeshkian, visiting The Bushehr Nuclear Power Plant different parts of the nuclear power plant which is being developed within three phases. The two operations Pezeshkian ordered to launch are related to phases 2 and 3, which include the installation of key equipment at the reactor building of the second unit to increase safety. Bushehr, Iran,  February 13, 2025. Photo by SalamPix/ABACAPRESS.COM

  •  
Iran President Visits Bushehr Nuclear Power Plant - Iran

Iran President Visits Bushehr Nuclear Power Plant - Iran

Iran’s President Masoud Pezeshkian, visiting The Bushehr Nuclear Power Plant different parts of the nuclear power plant which is being developed within three phases. The two operations Pezeshkian ordered to launch are related to phases 2 and 3, which include the installation of key equipment at the reactor building of the second unit to increase safety. Bushehr, Iran,  February 13, 2025. Photo by SalamPix/ABACAPRESS.COM

  • Main
  • Top
  • Editorial
  • Creative
  • About Us
  • About ILG
  • Terms of use
  • Company
  • BEHIND
  • Price List
  • Single Plan
  • Monthly Plan
  • Services
  • Shooting
  • Rights Clearance
  • Support
  • FAQ
  • How To Buy
  • Contact Us
  • Become a Partner

© KYODO NEWS IMAGES INC

All Rights Reserved.

  • Editorial
  • Olympics
  • News
  • Sports
  • Japan
  • Tech
  • Royal
  • Disaster
  • NorthKorea
  • Old Japan
  • SNS
  • Creative
  • Food
  • Japan
  • Landscape
  • Animal
  • Popular
  • #Ukraine
  • #China
  • #coronavirus
  • #N. Korea
  • #Thailand
  • #Russia
  • #Ukraine
  • #China
  • #coronavirus
  • #N. Korea
  • #Thailand
  • #Russia
  • Food
  • Japan
  • Landscape
  • Animal
  • Olympics
  • News
  • Sports
  • Japan
  • Tech
  • Royal
  • Disaster
  • NorthKorea
  • Old Japan
  • SNS