Lifting Of Cover Panels End At Fukushima Nuke Plant

**This is a 60-seconds sample of the video. For the full version, please contact us.**

Lifting Of Cover Panels End At Fukushima Nuke Plant

FUKUSHIMA, JAPAN – OCT. 5: The last of six panels of the cover shrouding the No. 1 reactor building of the disaster-hit Fukushima Daiichi nuclear plant was lifted on October 5. The lifting of cover panels, each of which is 42-meter long and seven-meter wide, started on July 28 as part of works to dismantle the plant. Tokyo Electric Power Co., the plant operator, said the next step will be a 1.5-year-long job to take away its wall panels and put on windbreak sheets instead, before trying to retrieve nuclear fuels from the pool by March 2021. The Fukushima plant caused serious melt down after hit by a mega earthquake and following tsunami on March 11 2011.

  • Product Code
  • ILEA000941086
  • Registered date
  • 2015/10/05 00:00:00
  • Credit
  • Kyodo / Kyodo News Images
  • Media source
  • Kyodo News
  • Media size
  • 1920 × 1080 pixel
  • Deployment size
  • 115.43(MB)*
  • Special instruction

*File size when opened in Photoshop, etc.

Similar Images & Videos