Track laying of Jakarta-Bandung HSR starts in Indonesia

**This is a 60-seconds sample of the video. For the full version, please contact us.**

Track laying of Jakarta-Bandung HSR starts in Indonesia

STORY: Track laying of Jakarta-Bandung HSR starts in Indonesia DATELINE: April 22, 2022 LENGTH: 00:05:02 LOCATION: Jakarta CATEGORY: ECONOMY/SOCIETY SHOTLIST: 1. various of the launching ceremony 2. various of track laying STORYLINE: Track laying of the Jakarta-Bandung High Speed Railway (HSR) has begun in Bandung Regency, Indonesia's West Java province, marking a solid step towards the whole line completion, according to the railway's operator. The railway's operator KCIC, a joint venture consortium between Chinese and Indonesian state-owned firms, said the total track laying of the 142-km HSR is 279.4 km, including 112.8 km of ballasted track section and 166.6 km of ballastless track. According to the KCIC, all the 50-meter steel rails used in the project are produced in China, with a total of 11,810 pieces weighing 35,881 tons. After being delivered to Indonesia, the 50-meter rails will be welded into 500-meter-long rails. The KCIC said 12 tunnels have been built along the railway and more than 91 pe

  • Product Code
  • ILEA000956999
  • Registered date
  • 2022/4/22 00:00:00
  • Credit
  • Xinhua / Kyodo News Images
  • Media source
  • Xinhua News Agency.All Rights Reserved
  • Media size
  • 1280 × 720 pixel
  • Deployment size
  • 312.28(MB)*
  • Special instruction

*File size when opened in Photoshop, etc.

Similar Images & Videos