Time lapse: Construction of Peljesac Bridge

**This is a 60-seconds sample of the video. For the full version, please contact us.**

Time lapse: Construction of Peljesac Bridge

STORY: Time lapse: Construction of Peljesac Bridge DATELINE: July 28, 2022 LENGTH: 00:01:04 LOCATION: KOMARNA, Croatia CATEGORY: TECHNOLOGY SHOTLIST: 1. various of the construction of the bridge STORYLINE: The Peljesac Bridge, a key infrastructure project in Croatia, opened to traffic on Tuesday. The 2.4-km-long bridge links the Croatian mainland with the Peljesac Peninsula of its southernmost Dubrovnik-Neretva County, bypassing a short strip of land belonging to Bosnia and Herzegovina. The cable-stayed bridge gives Croatia its long-awaited territorial continuity and travel convenience. A Chinese consortium led by the China Road and Bridge Corporation (CRBC) won the bid to build the Peljesac Bridge and its access roads in 2018. Construction of the bridge started in July 2018 and was completed on time. Xinhua News Agency correspondents reporting from Komarna, Croatia. (XHTV)

  • Product Code
  • ILEA000999363
  • Registered date
  • 2022/7/28 00:00:00
  • Credit
  • Xinhua / Kyodo News Images
  • Media source
  • Xinhua News Agency.All Rights Reserved
  • Media size
  • 1920 × 1080 pixel
  • Deployment size
  • 71.15(MB)*
  • Special instruction

*File size when opened in Photoshop, etc.

Similar Images & Videos