Section of Jakarta-Bandung High Speed Railway ready for trial operation

**This is a 60-seconds sample of the video. For the full version, please contact us.**

Section of Jakarta-Bandung High Speed Railway ready for trial operation

STORY: Section of Jakarta-Bandung High Speed Railway ready for trial operation DATELINE: Nov. 6, 2022 LENGTH: 0:00:49 LOCATION: Jakarta CATEGORY: ECONOMY SHOTLIST: 1. various of Jakarta-Bandung High Speed Railway STORYLINE: A trial section of the Jakarta-Bandung High-Speed Railway in Indonesia was ready for test operation after its traction substation and other equipment were installed and commissioned on Saturday. The 14-km-long test track is located between Tegalluar Station and Casting Yard No. 4. The trial operation is scheduled to begin by mid-November. With a design speed of 350 km per hour, the railway built with Chinese technology will cut the journey between Jakarta and Bandung, the capital of Indonesia's West Java province, from over three hours to around 40 minutes. The railway is regarded as the link between China's Belt and Road Initiative and Indonesia's Global Maritime Fulcrum strategy. It is expected to be put into operation in June 2023. Xinhua News Agency correspondents reporting fro

  • Product Code
  • ILEA001053747
  • Registered date
  • 2022/11/06 00:00:00
  • Credit
  • Xinhua / Kyodo News Images
  • Media source
  • Xinhua News Agency.All Rights Reserved
  • Media size
  • 1920 × 1080 pixel
  • Deployment size
  • 46.43(MB)*
  • Special instruction

*File size when opened in Photoshop, etc.

Similar Images & Videos