Huge wind turbine set up in Pacific off Chiba Pref.
CHOSHI, Japan - Photo taken from a Kyodo News helicopter on Oct. 17, 2012, shows a 126-meter-high wind turbine built in the Pacific some 3 kilometers off Choshi, Chiba Prefecture, which starts power generation possibly in January 2013. Its output will be around 2,400 kilowatt-hours.
- Product Code
- ILEA001175946
- Registered date
- 2012/10/22 00:00:00
- Credit
- Kyodo / Kyodo News Images
- Media source
- 2012 Kyodo News
- Media size
- 2529 × 3192 pixel
- Deployment size
- 1.84(MB)*
*File size when opened in Photoshop, etc.