Steel beam removed from pool at Fukushima plant

Steel beam removed from pool at Fukushima plant

FUKUSHIMA, Japan - Photo taken from a Kyodo News helicopter on Dec. 20, 2012, shows Tokyo Electric Power Co.'s operation employing a remote-controlled crane to remove a steel beam from a spent nuclear fuel pool in the No. 3 reactor building at the crippled Fukushima Daiichi nuclear plant in Fukushima Prefecture. The 7-meter steel beam weighing 470 kilograms dropped into the water-filled pool in September when the plant's operator TEPCO used a similar crane to remove debris from the upper portion of the building.

  • Product Code
  • ILEA001178157
  • Registered date
  • 2012/12/20 00:00:00
  • Credit
  • Kyodo / Kyodo News Images
  • Media source
  • 2012 Kyodo News
  • Media size
  • 1146 × 1670 pixel
  • Resolution
  • 240 dpi
  • Deployment size
  • 392.77(KB)*
  • Special instruction

*File size when opened in Photoshop, etc.

Similar Images & Videos