Major Chinese power transmission project now fully operational

**This is a 60-seconds sample of the video. For the full version, please contact us.**

Major Chinese power transmission project now fully operational

STORY: Major Chinese power transmission project now fully operational DATELINE: Dec. 30, 2022 LENGTH: 00:01:59 LOCATION: CHENGDU, China CATEGORY: ECONOMY SHOTLIST: 1. various of the project and staff working 2. SOUNDBITE (Chinese): LUO XIAOYI, Spokesperson of State Grid Sichuan Electric Power Company STORYLINE: China has put into full operation a major domestic power transmission project that sends electricity from the resource-rich west of the country to energy-consuming regions in the east. According to the State Grid Corporation of China (State Grid), the construction of the Baihetan-Zhejiang 800-kilovolt ultra-high-voltage (UHV) direct current power transmission project was completed on Friday and it has already started operating. The clean electricity generated in Baihetan, the country's second-largest hydropower station, will be sent from the southwestern province of Sichuan to eastern Zhejiang Province through a transmission line stretching 2,121 km. SOUNDBITE (Chinese): LUO XIAOYI, Spokesperson

  • Product Code
  • ILEA001222207
  • Registered date
  • 2022/12/31 00:00:00
  • Credit
  • Xinhua / Kyodo News Images
  • Media source
  • Xinhua News Agency.All Rights Reserved
  • Media size
  • 1920 × 1080 pixel
  • Deployment size
  • 123.25(MB)*
  • Special instruction

*File size when opened in Photoshop, etc.

Similar Images & Videos