Chinese company helps Nepal's hydropower project achieve major progress in construction
STORY: Chinese company helps Nepal's hydropower project achieve major progress in construction
DATELINE: Jan. 19, 2023
LENGTH: 0:01:32
LOCATION: Kathmandu
CATEGORY: SOCIETY
SHOTLIST:
1 various of the tailrace tunnel of the Tanahu hydropower project
2 SOUNDBITE (Chinese): HUANG JIWEN, Deputy project manager
3 various of the construction site
STORYLINE:
The concrete lining construction for the tailrace tunnel of the Tanahu hydropower project in central Nepal was completed on Wednesday, laying a solid foundation for subsequent construction.
The tailrace tunnel runs 210 meters, with an 8.44 percent design slope.
The Tanahu hydropower project, located on the Seti River, will use a high-altitude dam to generate electricity with a total capacity of 146.4 megawatts.
Section 2 of the project for water diversion and power generation systems and permanent engineering equipment was contracted by PowerChina Sinohydro Bureau 11 Co., Ltd. in October 2018.
SOUNDBITE (Chinese): HUANG JIWEN, Deputy project manager
"A
- Product Code
- ILEA001228952
- Registered date
- 2023/1/19 00:00:00
- Credit
- Xinhua / Kyodo News Images
- Media source
- Xinhua News Agency.All Rights Reserved
- Media size
- 1920 × 1080 pixel
- Deployment size
- 98.83(MB)*
*File size when opened in Photoshop, etc.