CHINA-GUANGDONG-SHENZHEN-ZHONGSHAN-HIGHWAY-CONSTRUCTION (CN)

CHINA-GUANGDONG-SHENZHEN-ZHONGSHAN-HIGHWAY-CONSTRUCTION (CN)

(230131) -- ZHUHAI, Jan. 31, 2023 (Xinhua) -- A staff member maintains a device loading immersed tube E23 of Shenzhen-Zhongshan highway underwater tunnel at an immersed tube smart factory of CCCC Fourth Harbour Engineering Co., Ltd. on Niutou Island, Zhuhai, south China's Guangdong Province, Jan. 30, 2023. The prefabrication of E23, the last immersed tube (non-standard tube, including the final joint) of an underwater tunnel, a section of highway linking Shenzhen and Zhongshan in Guangdong, was completed on Tuesday. After being poured concrete, the 164.5-meter steel-shelled tube weighs about 80,000 tonnes. With a total length of 6,845 meters, the underwater tunnel consists of 5,035-meter-long prefabricated immersed tubes, including 32 ones and a final joint. The Shenzhen-Zhongshan highway, which is scheduled to open to traffic in 2024, is expected to cut the travel time between the two cities from two hours to about 20 minutes. (Xinhua/Liu Dawei)

  • Product Code
  • ILEA001234646
  • Registered date
  • 2023/1/31 00:00:00
  • Credit
  • Xinhua / Kyodo News Images
  • Media source
  • Xinhua News Agency.All Rights Reserved
  • Media size
  • 3000 × 2000 pixel
  • Resolution
  • dpi
  • Deployment size
  • 1.34(MB)*
  • Special instruction

*File size when opened in Photoshop, etc.

Similar Images & Videos