ANGOLA-MALANJE-CHINESE-BUILT-WATER-PROJECT-HANDOVER

ANGOLA-MALANJE-CHINESE-BUILT-WATER-PROJECT-HANDOVER

(230514) -- MALANJE, May 14, 2023 (Xinhua) -- This photo taken on May 12, 2023 shows the pump station of a Chinese-built water supply system reinforcement project in Angola's northern province of Malanje. Angolan President Joao Lourenco on Friday lauded a Chinese-built potable water project while attending the handover ceremony in Angola's northern province of Malanje. The water supply system reinforcement project, built by China Petroleum Pipeline Engineering Co., Ltd (CPP), can produce 720 cubic meters of potable water per hour, serving over 334,000 local residents, according to the CPP. (Xinhua/Lyu Chengcheng)

  • Product Code
  • ILEA001289954
  • Registered date
  • 2023/5/14 00:00:00
  • Credit
  • Xinhua / Kyodo News Images
  • Media source
  • Xinhua News Agency.All Rights Reserved
  • Media size
  • 6187 × 4124 pixel
  • Resolution
  • 72 dpi
  • Deployment size
  • 1.83(MB)*
  • Special instruction

*File size when opened in Photoshop, etc.

Similar Images & Videos