TANZANIA-ARUSHA-CHINESE-BUILT WATER SUPPLY PROJECT

TANZANIA-ARUSHA-CHINESE-BUILT WATER SUPPLY PROJECT

(240131) -- ARUSHA (TANZANIA), Jan. 31, 2024 (Xinhua) -- Jin Denghui, project manager of the Arusha new water supply system project, inspects a pump station of the project undertaken by Power Construction Corporation of China, in Arusha, Tanzania, on Jan. 28, 2024. The water supply project includes laying over 620 km of steel pipelines, constructing 11 pools and connecting the water supply pipeline network to 48,000 households, according to PowerChina. (Xinhua/Hua Hongli) TO GO WITH Feature: Chinese-built water supply project benefits 400,000 Tanzanians

  • Product Code
  • ILEA002257814
  • Registered date
  • 2024/2/01 00:00:00
  • Credit
  • Xinhua / Kyodo News Images
  • Media source
  • Xinhua News Agency.All Rights Reserved
  • Media size
  • 6240 × 4160 pixel
  • Resolution
  • dpi
  • Deployment size
  • 7.81(MB)*
  • Special instruction

*File size when opened in Photoshop, etc.

Similar Images & Videos