FPSO Completed in Qingdao

FPSO Completed in Qingdao

The Haikui No. 1 Floating Production, Storage, and Offloading Unit (FPSO) is being completed at Offshore Oil Engineering (Qingdao) Co., LTD., in Qingdao, China, on April 26, 2024. Known as the ''Super Energy Bowl,'' the ''Anemone 1'' has a maximum displacement of 100,000 tons, a maximum oil storage capacity of 60,000 tons, and can continuously operate at sea for 15 years without docking. Reports indicate that ''Haikui No. 1'' is the first cylindrical FPSO to be applied to Asian waters and will be used in the Liuhua oilfield in the Pearl River Estuary basin. (Photo by Costfoto/NurPhoto)

  • Product Code
  • ILEA002614452
  • Registered date
  • 2024/4/26 00:00:00
  • Credit
  • NurPhoto / Kyodo News Images
  • Media source
  • Costfoto/NurPhoto
  • Media size
  • 3536 × 2268 pixel
  • Resolution
  • 72 dpi
  • Deployment size
  • 2.65(MB)*
  • Special instruction
  • NO USE CHINA

*File size when opened in Photoshop, etc.

Similar Images & Videos