Rome Overwhelmed By Public Works Projects For Jubilee 2025
The transformation of Piazza Pia near Saint Peter’s basilica at the Vatican is underway on July 2024 in Rome, Italy. It is one of the most significant project, and one that has caused the greatest traffic disruption to date, is a new Vatican-area piazza and pedestrian zone connecting Castel St. Angelo with the Via della Conciliazione boulevard that leads to St. Peter's Square. - Pre-Jubilee public works projects have overwhelmed Rome, with flood-lit construction sites operating around the clock, entire swaths of central boulevards rerouted and traffic snarling the city's already clogged streets. The frenzy of work has snarled traffic, to the fury of residents, and left some visitors this summer feeling short-changed as they weave their way through myriad building sites. In addition to the Jubilee construction, there's a longer-term, separate project to extend Rome's Metro C subway line into Rome's historic center, which has encountered years of delays thanks to archaeological excavations of ancient Roman ruin
- Product Code
- ILEA003002615
- Registered date
- 2024/7/10 00:00:00
- Credit
- Abaca Press / Kyodo News Images
- Media source
- Vandeville Eric/ABACA
- Media size
- 7905 × 5149 pixel
- Deployment size
- 2.92(MB)*
*File size when opened in Photoshop, etc.