Huge wind turbine set up in Pacific off Chiba Pref.

Huge wind turbine set up in Pacific off Chiba Pref.

CHOSHI, Japan - Photo taken from a Kyodo News helicopter on Oct. 22, 2012, shows a 126-meter-high wind turbine built in the Pacific some 3 kilometers off Choshi, Chiba Prefecture, which was shown to reporters the same day before it starts power generation possibly in January 2013. Its output will be around 2,400 kilowatt-hours. Cape Nagasakihana can be seen in the back.

  • Product Code
  • ILEA001175957
  • Registered date
  • 2012/10/22 00:00:00
  • Credit
  • Kyodo / Kyodo News Images
  • Media source
  • 2012 Kyodo News
  • Media size
  • 2882 × 1941 pixel
  • Resolution
  • 240 dpi
  • Deployment size
  • 910.29(KB)*
  • Special instruction

*File size when opened in Photoshop, etc.

Similar Images & Videos